If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0335040801020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.825372,"lon":-114.528431,"icon":""}]} |
| Location: 02/01-08-033-04W5/0 | |
| Location Alias: 02/01-08-33-04 W5M | |
| Location Alias 2: 02/01-08-033-04 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 033 | |
| Meridian: 5 | |
| Range: 04 | |
| Section: 08 | |
| County/Municipality: Mountain View County | |
| Well Name: RIDGEBACK CAROL 1-8-33-4 | |
| Operator Name: Ridgeback Resources Inc. | |
| License Number: 0447706 | |
| License Date: 2012-08-13 | |
| License Status: Issued | |
| Spud Date: 2012-08-29 | |
| Final Drill Date: 2012-09-08 | |
| Well Total Depth: 3672.00 m | |
| Surface Hole Latitude: 51.825372 | |
| Surface Hole Longitude: -114.528431 |
| Date | Event |
|---|---|
| 2012-08-13 | Obtained License |
| 2012-08-31 | Surface Casing Operation Performed |
| 2012-09-02 | Direction Drilling Operation Performed - Deviate |
| 2012-09-03 | Direction Drilling Operation Performed - Horizontal |
| 2012-09-08 | Finished Drilling |
| 2012-09-08 | Well Log Performed |
| 2012-09-08 | Well Mode changed to Drilled and Cased |
| 2012-09-10 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-09-10 | Production Casing Operation Performed |
| 2012-09-11 | Rig Released |
| 2012-09-25 | Well Log Performed |
| 2012-10-02 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-10-03 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-10-04 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-10-05 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-10-06 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-10-07 | Well Began Production |
| 2012-10-07 | Well Fluid changed to Crude Oil |
| 2012-10-07 | Well Mode changed to Flowing |
| 2015-12-01 | Well Fluid changed to Crude Oil |
| 2015-12-01 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-08-29 | Savanna Drilling Corp. | 652E | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-09-02 | 1753.40 | Deviate (5 - 79 degrees) |
| 2012-09-03 | 2236.30 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-09-10 | Open Hole/Barefoot Completion | 3646.00 | 3672.00 | 0 |
| 2012-10-05 | Multi-Stage Fracture | 3069.20 | 3069.30 | 0 |
| 2012-10-05 | Multi-Stage Fracture | 3007.40 | 3007.50 | 0 |
| 2012-10-05 | Multi-Stage Fracture | 2945.70 | 2945.80 | 0 |
| 2012-10-05 | Multi-Stage Fracture | 2872.20 | 2872.30 | 0 |
| 2012-10-05 | Multi-Stage Fracture | 2809.60 | 2809.70 | 0 |
| 2012-10-05 | Multi-Stage Fracture | 2734.60 | 2734.70 | 0 |
| 2012-10-06 | Multi-Stage Fracture | 2662.60 | 2662.70 | 0 |
| 2012-10-06 | Multi-Stage Fracture | 2600.00 | 2600.10 | 0 |
| 2012-10-06 | Multi-Stage Fracture | 2537.60 | 2537.70 | 0 |
| 2012-10-06 | Multi-Stage Fracture | 2467.90 | 2468.00 | 0 |
| 2012-10-02 | Multi-Stage Fracture | 3620.70 | 3620.80 | 0 |
| 2012-10-06 | Multi-Stage Fracture | 2392.80 | 2392.90 | 0 |
| 2012-10-06 | Multi-Stage Fracture | 2334.50 | 2334.60 | 0 |
| 2012-10-02 | Multi-Stage Fracture | 3552.00 | 3552.10 | 0 |
| 2012-10-03 | Multi-Stage Fracture | 3479.30 | 3479.40 | 0 |
| 2012-10-03 | Multi-Stage Fracture | 3418.20 | 3418.30 | 0 |
| 2012-10-04 | Multi-Stage Fracture | 3343.40 | 3343.50 | 0 |
| 2012-10-04 | Multi-Stage Fracture | 3281.90 | 3282.00 | 0 |
| 2012-10-04 | Multi-Stage Fracture | 3207.00 | 3207.10 | 0 |
| 2012-10-04 | Multi-Stage Fracture | 3145.60 | 3145.70 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 1663 | 0.0 | 0.0 | 0.0 |
| 2013 | 6271 | 0.0 | 0.0 | 0.0 |
| 2014 | 8349 | 0.0 | 0.0 | 0.0 |
| 2015 | 8567 | 0.0 | 0.0 | 0.0 |
| 2016 | 8783 | 0.0 | 0.0 | 0.0 |
| 2017 | 8039 | 0.0 | 0.0 | 0.0 |
| 2018 | 7878 | 0.0 | 0.0 | 0.0 |
| 2019 | 8224 | 0.0 | 0.0 | 0.0 |
| 2020 | 2171 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-09-11 | No Incident Encountered | 0.00 | 0.00 |
| 2012-10-08 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]