X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0335040803002

Well Details

Well ID: 0335040803002
Loading map...
Location: 00/03-08-033-04W5/2
Location Alias: 00/03-08-33-04 W5M
Location Alias 2: 00/03-08-033-04 W5/02
Country: Canada
Province: Alberta
Township: 033
Meridian: 5
Range: 04
Section: 08
County/Municipality: Mountain View County
Well Name: NAL CAROL 3-8-33-4
Operator Name: NAL Resources Limited
License Number: 0009256
License Date: 1955-03-08
License Status: Issued
Spud Date: 1955-03-14
Final Drill Date: 1955-05-24
Well Total Depth: 2740.20 m
Surface Hole Latitude: 51.811364
Surface Hole Longitude: -114.536013

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-03-08 Obtained License
1955-05-24 Drill Stem Test Performed
1955-05-24 Finished Drilling
1955-05-24 Well Mode changed to Drilled and Cased
1955-05-27 Production Casing Operation Performed
1955-05-28 Well Log Performed
1955-05-29 Perforation Treatment Performed - Bullet Perforation
1955-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-06-06 Perforation Treatment Performed - Bullet Perforation
1955-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-01-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-01-19 Plug Back Performed
2003-06-06 Perforation Treatment Performed - Jet Perforation
2003-06-08 Perforation Treatment Performed - Fractured
2003-11-01 Well Began Production
2003-11-01 Well Fluid changed to Crude Oil
2003-11-01 Well Mode changed to Flowing
2004-04-01 Well Fluid changed to Crude Oil
2004-04-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1955-05-29 Bullet Perforation 2707.80 2710.90 13
2003-06-06 Perforation 2391.50 2397.00 17
2003-06-08 Fracture 2391.50 2403.50 0
1955-05-29 Bullet Perforation 2712.70 2714.90 13
1955-06-01 Acid Treatment 2707.80 2714.90 0
1955-06-06 Bullet Perforation 2686.20 2688.00 13
1955-06-06 Bullet Perforation 2691.40 2693.20 13
1955-06-06 Bullet Perforation 2697.50 2700.50 13
1955-06-07 Acid Treatment 2707.80 2714.90 0
2001-01-19 Packing Device Capped w/Cement 2667.00 2675.00 0
2003-06-06 Perforation 2400.50 2403.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 1460 0.0 0.0 0.0
2004 8564 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8627 0.0 0.0 0.0
2010 8753 0.0 0.0 0.0
2011 8447 0.0 0.0 0.0
2012 8780 0.0 0.0 0.0
2013 8447 0.0 0.0 0.0
2014 8723 0.0 0.0 0.0
2015 8420 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8399 0.0 0.0 0.0
2019 7392 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References