X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0335040809000

Well Details

Well ID: 0335040809000
Loading map...
Location: 00/09-08-033-04W5/0
Location Alias: 00/09-08-33-04 W5M
Location Alias 2: 00/09-08-033-04 W5/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 5
Range: 04
Section: 08
County/Municipality: Mountain View County
Well Name: NAL CAROL 9-8-33-4
Operator Name: NAL Resources Limited
License Number: 0011506
License Date: 1956-05-31
License Status: Suspension
Spud Date: 1956-05-31
Final Drill Date: 1956-07-20
Well Total Depth: 2706.30 m
Surface Hole Latitude: 51.818047
Surface Hole Longitude: -114.524350

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-05-31 Obtained License
1956-07-20 Finished Drilling
1956-07-20 Well Mode changed to Drilled and Cased
1956-07-23 Drill Stem Test Performed
1956-07-25 Perforation Treatment Performed - Bullet Perforation
1956-07-25 Perforation Treatment Performed - Jet Perforation
1956-07-25 Production Casing Operation Performed
1956-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-08-09 Well Began Production
1956-08-09 Well Fluid changed to Crude Oil
1956-08-09 Well Mode changed to Flowing
1985-02-01 Well Fluid changed to Crude Oil
1985-02-01 Well Mode changed to Suspended
1990-07-01 Well Fluid changed to Crude Oil
1990-07-01 Well Mode changed to Pumping
2001-06-11 Well Log Performed
2001-06-19 Well Log Performed
2001-06-21 Well Log Performed
2001-06-25 Plug Back Performed
2001-06-29 Well Log Performed
2001-06-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-30 Perforation Treatment Performed - Cement Plug
2001-06-30 Perforation Treatment Performed - Jet Perforation
2001-06-30 Well Log Performed
2001-07-01 Perforation Treatment Performed - Jet Perforation
2001-07-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-07-05 Well Log Performed
2001-07-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-07-06 Perforation Treatment Performed - Jet Perforation
2001-07-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-07-18 Liner Casing Operation Performed
2001-07-20 Well Log Performed
2001-07-21 Perforation Treatment Performed - Jet Perforation
2001-07-24 Perforation Treatment Performed - Fractured
2001-08-01 Well Fluid changed to Crude Oil
2001-08-01 Well Mode changed to Pumping
2011-10-01 Well Fluid changed to Crude Oil
2011-10-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-07-25 Perforation 2660.30 2667.60 7
2001-07-06 Packing Device Capped w/Cement 597.00 598.00 0
2001-07-11 Packing Device Capped w/Cement 850.80 851.80 0
2001-07-21 Perforation 2360.00 2365.00 20
2001-07-24 Fracture 2360.00 2365.00 0
1956-07-25 Bullet Perforation 2660.30 2667.60 13
1956-08-01 Acid Treatment 2660.30 2667.60 0
2001-06-30 Cement Plug 2639.50 2647.60 0
2001-06-30 Perforation 1595.00 1596.10 72
2001-06-30 Packing Device Capped w/Cement 1594.00 1595.00 0
2001-07-01 Perforation 856.00 857.00 13
2001-07-03 Packing Device Capped w/Cement 838.20 839.20 0
2001-07-06 Perforation 615.00 616.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 12 0.0 0.0 0.0
1981 72 0.0 0.0 0.0
1990 2850 0.0 0.0 0.0
1991 8437 0.0 0.0 0.0
1992 8711 0.0 0.0 0.0
1993 7620 0.0 0.0 0.0
1994 7734 0.0 0.0 0.0
1995 8236 0.0 0.0 0.0
1996 6719 0.0 0.0 0.0
2001 744 0.0 0.0 0.0
2005 1128 0.0 0.0 0.0
2006 741 0.0 0.0 0.0

For data sources see[5]

References