X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0335040815002

Well Details

Well ID: 0335040815002
Loading map...
Location: 00/15-08-033-04W5/2
Location Alias: 00/15-08-33-04 W5M
Location Alias 2: 00/15-08-033-04 W5/02
Country: Canada
Province: Alberta
Township: 033
Meridian: 5
Range: 04
Section: 08
County/Municipality: Mountain View County
Well Name: NAL CAROL 15-8-33-4
Operator Name: NAL Resources Limited
License Number: 0012119
License Date: 1956-08-17
License Status: Issued
Spud Date: 1956-08-14
Final Drill Date: 1956-09-25
Well Total Depth: 2718.80 m
Surface Hole Latitude: 51.822214
Surface Hole Longitude: -114.530187

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-08-17 Obtained License
1956-09-25 Finished Drilling
1956-09-25 Well Mode changed to Drilled and Cased
1956-09-27 Production Casing Operation Performed
1956-09-30 Perforation Treatment Performed - Bullet Perforation
1956-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-05-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-05-27 Plug Back Performed
1992-05-27 Well Log Performed
1992-05-28 Well Log Performed
1992-05-30 Perforation Treatment Performed - Jet Perforation
1992-05-30 Well Log Performed
1992-06-05 Perforation Treatment Performed - Fractured
1992-06-08 Well Began Production
1992-06-08 Well Fluid changed to Crude Oil
1992-06-08 Well Mode changed to Flowing
2006-01-01 Well Fluid changed to Crude Oil
2006-01-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-09-30 Bullet Perforation 2673.10 2679.20 20
1956-09-30 Bullet Perforation 2684.10 2690.20 20
1956-09-30 Bullet Perforation 2697.50 2698.70 20
1956-10-02 Acid Treatment 2673.10 2679.20 0
1992-05-27 Packing Device Capped w/Cement 2652.00 2660.00 0
1992-05-30 Perforation 2383.00 2386.00 14
1992-05-30 Perforation 2390.00 2394.00 14
1992-06-05 Fracture 2383.00 2394.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 4628 0.0 0.0 0.0
1993 8073 0.0 0.0 0.0
1994 8633 0.0 0.0 0.0
1995 8707 0.0 0.0 0.0
1996 8375 0.0 0.0 0.0
1997 8711 0.0 0.0 0.0
1998 8641 0.0 0.0 0.0
1999 8533 0.0 0.0 0.0
2000 8711 0.0 0.0 0.0
2001 8682 0.0 0.0 0.0
2002 8423 0.0 0.0 0.0
2003 8340 0.0 0.0 0.0
2004 8625 0.0 0.0 0.0
2005 8238 0.0 0.0 0.0
2006 8403 0.0 0.0 0.0
2007 8469 0.0 0.0 0.0
2008 8255 0.0 0.0 0.0
2009 8699 0.0 0.0 0.0
2010 8741 0.0 0.0 0.0
2011 8435 0.0 0.0 0.0
2012 8780 0.0 0.0 0.0
2013 5447 0.0 0.0 0.0
2014 8459 0.0 0.0 0.0
2015 8496 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8304 0.0 0.0 0.0
2019 7852 0.0 0.0 0.0
2020 1723 0.0 0.0 0.0

For data sources see[5]

References