X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0335043116020

Well Details

Well ID: 0335043116020
Loading map...
Location: 02/16-31-033-04W5/0
Location Alias: 02/16-31-33-04 W5M
Location Alias 2: 02/16-31-033-04 W5/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 5
Range: 04
Section: 31
County/Municipality: Mountain View County
Well Name: NAL HZ CAROL 16-31-33-4
Operator Name: NAL Resources Limited
License Number: 0485334
License Date: 2017-09-11
License Status: Issued
Spud Date: 2017-10-20
Final Drill Date: 2017-11-06
Well Total Depth: 4112.00 m
Surface Hole Latitude: 51.867224
Surface Hole Longitude: -114.552030

For data sources see[1][2]

Well History

Date Event
2017-09-11 Obtained License
2017-10-21 Surface Casing Operation Performed
2017-10-25 Direction Drilling Operation Performed - Deviate
2017-10-28 Direction Drilling Operation Performed - Horizontal
2017-10-28 Intermediate Casing Operation Performed
2017-11-06 Finished Drilling
2017-11-06 Well Mode changed to Drilled and Cased
2017-11-07 Well Log Performed
2017-11-08 Liner Casing Operation Performed
2017-11-09 Rig Released
2017-11-23 Perforation Treatment Performed - Multi-Stage Fracture
2017-12-19 Well Began Production
2017-12-19 Well Fluid changed to Gas
2017-12-19 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-10-20 Horizon Drilling Inc. 2 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-10-25 2392.20 Deviate (5 - 79 degrees)
2017-10-28 2732.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-11-23 Multi-Stage Fracture 4075.90 4076.90 0
2017-11-23 Multi-Stage Fracture 3493.20 3494.20 0
2017-11-23 Multi-Stage Fracture 3421.90 3422.90 0
2017-11-23 Multi-Stage Fracture 3376.20 3377.20 0
2017-11-23 Multi-Stage Fracture 3289.30 3290.30 0
2017-11-23 Multi-Stage Fracture 3230.00 3231.00 0
2017-11-23 Multi-Stage Fracture 3170.50 3171.50 0
2017-11-23 Multi-Stage Fracture 3085.50 3086.50 0
2017-11-23 Multi-Stage Fracture 3012.80 3013.80 0
2017-11-23 Multi-Stage Fracture 2940.60 2941.60 0
2017-11-23 Multi-Stage Fracture 2868.20 2869.20 0
2017-11-23 Multi-Stage Fracture 4017.10 4018.10 0
2017-11-23 Multi-Stage Fracture 2795.70 2796.70 0
2017-11-23 Multi-Stage Fracture 3945.10 3946.10 0
2017-11-23 Multi-Stage Fracture 3885.70 3886.70 0
2017-11-23 Multi-Stage Fracture 3814.20 3815.20 0
2017-11-23 Multi-Stage Fracture 3754.60 3755.60 0
2017-11-23 Multi-Stage Fracture 3682.40 3683.40 0
2017-11-23 Multi-Stage Fracture 3623.30 3624.30 0
2017-11-23 Multi-Stage Fracture 3551.10 3552.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-11-23 2017-11-23 2,619 4,214 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 86.6576 N/A
30/50 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 11.9316 N/A
50/140 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 0.8282 N/A
15% HCL Acid Step Energy Services Acid Hydrochloric Acid 7647-01-0 100 0.1962 N/A
Water 7732-18-5 100 0.1962 N/A
Econocide B1008 (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0089 N/A
Methyl Alcohol 67-56-1 100 0.0089 N/A
Non-Hazardous Ingredients Not Available 100 0.0089 N/A
SBO-1 (Breaker) Step Energy Services Breaker Disodium peroxydisulfate 7775-27-1 100 0.0025 N/A
SCS-8 (Clay Control) Step Energy Services Clay Control Inorganic Salt Not Available 100 0.1126 N/A
SCI-4 (Corrosion Inhibitor) Step Energy Services Corrosion Inhibitor Methanol 67-56-1 100 0.0013 N/A
Modified Thiourea Polymer 68527-49-1 100 0.0013 N/A
Olefin 64743-02-8 100 0.0013 N/A
Polyoxyalkylenes 68951-67-7 100 0.0013 N/A
Propargyl Alcohol 107-19-7 100 0.0013 N/A
SNE-3 (Non-Emulsifier) Step Energy Services Demulsifier Isopropyl Alcohol 67-63-0 100 0.0003 N/A
Methyl Alcohol 67-56-1 100 0.0003 N/A
Non-Hazardous Ingredients Not Available 100 0.0003 N/A
Oxydi-2.1-ethyldiyl)bis(cocoalkyl)dimethyl
ammonium dichloride
68607-28-3 100 0.0003 N/A
SFR-106 (Friction Reducer) Step Energy Services Friction Reducer Ethoxylated Alcohol 78330-21-9 100 0.2208 N/A
Non-Hazardous Ingredients Not Available 100 0.2208 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.2208 N/A
SIC-3 (Iron Chelator) Step Energy Services Iron Control Citric Acid 77-92-9 100 0.0009 N/A
SNE-2 (Non-Emulsifier) Step Energy Services Surfactant 2-Ethylhexanol distillation residue 68609-68-7 100 0.0384 N/A
Dodecylbenzene Sulfonic Acid 27176-87-0 100 0.0384 N/A
Methanol 67-56-1 100 0.0384 N/A
Monoethanolamine 141-43-5 100 0.0384 N/A
Oxirane. methyl-. polymer 11/6/9003 100 0.0384 N/A
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- 9043-30-5 100 0.0384 N/A
Water 7732-18-5 100 0.0384 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-08-28 2017-08-30 Municipal Water 4441

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 432 0.0 0.0 0.0
2018 8637 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-12-08 No Incident Encountered 0.00 0.00

For data sources see[10]

References