X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0335070806000

Well Details

Well ID: 0335070806000
Loading map...
Location: 00/06-08-033-07W5/0
Location Alias: 00/06-08-33-07 W5M
Location Alias 2: 00/06-08-033-07 W5/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 5
Range: 07
Section: 08
County/Municipality: Mountain View County
Well Name: PC ET AL RICINUS 6-8-33-7
Operator Name: TAQA North Ltd.
License Number: 0091893
License Date: 1981-08-26
License Status: Abandoned
Spud Date: 1981-10-02
Final Drill Date: 1981-11-17
Well Total Depth: 2660.00 m
Surface Hole Latitude: 51.812641
Surface Hole Longitude: -114.964806

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-08-26 Obtained License
1981-11-17 Finished Drilling
1981-11-17 Well Mode changed to Drilled and Cased
1981-11-22 Production Casing Operation Performed
1982-01-09 Perforation Treatment Performed - Jet Perforation
1982-01-13 Perforation Treatment Performed - Fractured
1982-09-07 Well Began Production
1982-09-07 Well Fluid changed to Crude Oil
1982-09-07 Well Mode changed to Pumping
1983-02-06 Well Fluid changed to Crude Oil
1983-02-06 Well Mode changed to Suspended
1993-03-04 Well Fluid changed to Crude Oil
1993-03-04 Well Mode changed to Pumping
1995-02-01 Well Fluid changed to Crude Oil
1995-02-01 Well Mode changed to Suspended
1995-09-15 Well Fluid changed to Crude Oil
1995-09-15 Well Mode changed to Pumping
1997-11-04 Well Fluid changed to Crude Oil
1997-11-04 Well Mode changed to Suspended
1998-05-06 Well Fluid changed to Crude Oil
1998-05-06 Well Mode changed to Pumping
2002-05-29 Well Fluid changed to Crude Oil
2002-05-29 Well Mode changed to Suspended
2004-01-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-01-06 Plug Back Performed
2004-01-06 Well Fluid changed to Crude Oil
2004-01-06 Well Mode changed to Abandoned Zone
2004-01-08 Perforation Treatment Performed - Jet Perforation
2004-01-08 Well Log Performed
2004-01-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-01-09 Perforation Treatment Performed - Remedial Casing
2004-01-11 Perforation Treatment Performed - Jet Perforation
2004-01-11 Well Log Performed
2004-01-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-01-12 Perforation Treatment Performed - Cement Plug
2004-01-12 Perforation Treatment Performed - Remedial Casing
2004-01-13 Perforation Treatment Performed - Jet Perforation
2004-01-14 Perforation Treatment Performed - Remedial Casing
2004-01-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-01-16 Perforation Treatment Performed - Jet Perforation
2004-01-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-01-17 Perforation Treatment Performed - Remedial Casing
2004-01-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-01-18 Perforation Treatment Performed - Jet Perforation
2004-01-18 Perforation Treatment Performed - Remedial Casing
2004-01-19 Well Abandoned
2004-01-19 Well Fluid changed to Crude Oil
2004-01-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-01-09 Perforation 2625.00 2630.00 14
2004-01-11 Perforation 1659.00 1660.00 15
2004-01-12 Remedial Casing Cementing 1659.00 1660.00 0
2004-01-12 Packing Device Capped w/Cement 1644.00 1654.00 0
2004-01-12 Remedial Casing Cementing 1594.00 1595.00 0
2004-01-12 Cement Plug 1563.50 1594.00 0
2004-01-13 Perforation 609.00 610.00 15
2004-01-14 Remedial Casing Cementing 609.00 610.00 0
2004-01-15 Packing Device Capped w/Cement 586.00 605.00 0
2004-01-16 Perforation 453.00 454.00 15
2004-01-17 Remedial Casing Cementing 453.00 454.00 0
1982-01-13 Fracture 2625.00 2630.00 0
2004-01-17 Packing Device Capped w/Cement 429.00 446.00 0
2004-01-18 Perforation 310.00 311.00 15
2004-01-18 Remedial Casing Cementing 310.00 311.00 0
2004-01-18 Packing Device Capped w/Cement 284.00 310.00 0
2004-01-06 Packing Device Capped w/Cement 2610.00 2618.00 0
2004-01-08 Perforation 1864.00 1865.00 14
2004-01-08 Perforation 1925.00 1926.00 14
2004-01-09 Remedial Casing Cementing 1925.00 1926.00 0
2004-01-09 Packing Device Capped w/Cement 1908.00 1918.00 0
2004-01-09 Remedial Casing Cementing 1864.00 1865.00 0
2004-01-11 Perforation 1594.00 1595.00 15

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 643 0.0 0.0 0.0
1983 208 0.0 0.0 0.0
1993 3192 0.0 0.0 0.0
1995 2413 0.0 0.0 0.0
1996 6731 0.0 0.0 0.0
1997 3807 0.0 0.0 0.0
1998 2465 0.0 0.0 0.0

For data sources see[5]

References