X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344023211000

Well Details

Well ID: 0344023211000
Loading map...
Location: 00/11-32-034-02W4/0
Location Alias: 00/11-32-34-02 W4M
Location Alias 2: 00/11-32-034-02 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 02
Section: 32
County/Municipality: Special Areas No. 4
Well Name: RHE COMPEER 11-32-34-2
Operator Name: Rolling Hills Energy Ltd.
License Number: 0476472
License Date: 2015-08-07
License Status: Issued
Spud Date: 2015-08-25
Final Drill Date: 2015-08-31
Well Total Depth: 1582.00 m
Surface Hole Latitude: 51.953826
Surface Hole Longitude: -110.254840

For data sources see[1][2]

Well History

Date Event
2015-08-07 Obtained License
2015-08-26 Surface Casing Operation Performed
2015-08-29 Direction Drilling Operation Performed - Deviate
2015-08-30 Direction Drilling Operation Performed - Horizontal
2015-08-31 Finished Drilling
2015-08-31 Production Casing Operation Performed
2015-08-31 Rig Released
2015-08-31 Well Log Performed
2015-08-31 Well Mode changed to Drilled and Cased
2015-09-03 Well Log Performed
2015-09-12 Perforation Treatment Performed - Abrasa-Jet Perforation
2015-09-12 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-20 Well Began Production
2015-09-20 Well Fluid changed to Crude Oil
2015-09-20 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-08-25 Predator Drilling Inc. 7 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-08-29 469.00 Deviate (5 - 79 degrees)
2015-08-30 886.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-09-12 Hydra Jet Perforation 1381.40 1383.30 0
2015-09-12 Multi-Stage Fracture 1235.10 1237.00 0
2015-09-12 Hydra Jet Perforation 1204.10 1206.00 0
2015-09-12 Multi-Stage Fracture 1204.10 1206.00 0
2015-09-12 Hydra Jet Perforation 1172.80 1174.70 0
2015-09-12 Multi-Stage Fracture 1172.80 1174.70 0
2015-09-12 Hydra Jet Perforation 1141.50 1143.40 0
2015-09-12 Multi-Stage Fracture 1141.50 1143.40 0
2015-09-12 Hydra Jet Perforation 1110.20 1112.10 0
2015-09-12 Multi-Stage Fracture 1110.20 1112.10 0
2015-09-12 Hydra Jet Perforation 1079.10 1081.00 0
2015-09-12 Multi-Stage Fracture 1381.40 1383.30 0
2015-09-12 Multi-Stage Fracture 1079.10 1081.00 0
2015-09-12 Hydra Jet Perforation 1048.60 1050.50 0
2015-09-12 Multi-Stage Fracture 1048.60 1050.50 0
2015-09-12 Hydra Jet Perforation 1017.20 1019.10 0
2015-09-12 Multi-Stage Fracture 1017.20 1019.10 0
2015-09-12 Hydra Jet Perforation 986.00 987.90 0
2015-09-12 Multi-Stage Fracture 986.00 987.90 0
2015-09-12 Hydra Jet Perforation 954.70 956.60 0
2015-09-12 Multi-Stage Fracture 954.70 956.60 0
2015-09-12 Hydra Jet Perforation 923.50 925.40 0
2015-09-12 Hydra Jet Perforation 1350.00 1351.90 0
2015-09-12 Multi-Stage Fracture 923.50 925.40 0
2015-09-12 Hydra Jet Perforation 892.40 894.30 0
2015-09-12 Multi-Stage Fracture 892.40 894.30 0
2015-09-12 Hydra Jet Perforation 863.80 865.70 0
2015-09-12 Multi-Stage Fracture 863.80 865.70 0
2015-09-12 Multi-Stage Fracture 1350.00 1351.90 0
2015-09-12 Hydra Jet Perforation 1294.40 1296.30 0
2015-09-12 Multi-Stage Fracture 1294.40 1296.30 0
2015-09-12 Hydra Jet Perforation 1264.60 1266.50 0
2015-09-12 Multi-Stage Fracture 1264.60 1266.50 0
2015-09-12 Hydra Jet Perforation 1235.10 1237.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-09-12 2015-09-12 747 593 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 71.9012 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 27.5169 N/A
IH-BEZ-6 Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0229 N/A
IH-CBX-6 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1432 N/A
Ethylene glycol 107-21-1 100 0.1432 N/A
Potassium Carbonate 584-08-7 100 0.1432 N/A
Potassium Hydroxide 1310-58-3 100 0.1432 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.3013 N/A
IH-NE-6 Fusion Technologies Inc. Surfactant 2-ethyhexanol 104-76-7 100 0.1142 N/A
EO-C7-9-iso. C8-rich alcohols 78330-19-5 100 0.1142 N/A
EO-C9-11-iso. C10-rich alcohols 78330-20-8 100 0.1142 N/A
Heavy aromatic naptha 64742-94-5 100 0.1142 N/A
Isopropanol 67-63-0 100 0.1142 N/A
Methanol 67-56-1 100 0.1142 N/A
Polyethylene glycol 25322-68-3 100 0.1142 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-09-11 2015-09-11 Surface Water - Runoff 620

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 2112 0.0 0.0 0.0
2016 8663 0.0 0.0 0.0
2017 8498 0.0 0.0 0.0
2018 8659 0.0 0.0 0.0
2019 8111 0.0 0.0 0.0
2020 1836 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-08-25 No Incident Encountered 0.00 0.00
2015-09-12 No Incident Encountered 0.00 0.00

For data sources see[10]

References