X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344023314020

Well Details

Well ID: 0344023314020
Loading map...
Location: 02/14-33-034-02W4/0
Location Alias: 02/14-33-34-02 W4M
Location Alias 2: 02/14-33-034-02 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 02
Section: 33
County/Municipality: Special Areas No. 4
Well Name: RHE 102 HZ COMPEER 14-33-34-2
Operator Name: Rolling Hills Energy Ltd.
License Number: 0491085
License Date: 2018-09-24
License Status: Issued
Spud Date: 2018-10-25
Final Drill Date: 2018-11-09
Well Total Depth: 2282.00 m
Surface Hole Latitude: 51.953376
Surface Hole Longitude: -110.234319

For data sources see[1][2]

Well History

Date Event
2018-09-24 Obtained License
2018-10-26 Surface Casing Operation Performed
2018-11-07 Direction Drilling Operation Performed - Deviate
2018-11-07 Direction Drilling Operation Performed - Horizontal
2018-11-09 Finished Drilling
2018-11-09 Production Casing Operation Performed
2018-11-09 Rig Released
2018-11-09 Well Log Performed
2018-11-09 Well Mode changed to Drilled and Cased
2019-01-08 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-09 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-17 Well Began Production
2019-01-17 Well Fluid changed to Crude Oil
2019-01-17 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-11-07 Precision Drilling Corporation 292 N/A Drill To LD
2018-10-25 Predator Drilling Inc. 27 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-11-07 485.90 Deviate (5 - 79 degrees)
2018-11-07 842.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-01-08 Multi-Stage Fracture 2229.10 2229.20 0
2019-01-08 Multi-Stage Fracture 1933.40 1933.50 0
2019-01-08 Multi-Stage Fracture 1907.50 1907.60 0
2019-01-08 Multi-Stage Fracture 1870.30 1870.40 0
2019-01-08 Multi-Stage Fracture 1844.80 1844.90 0
2019-01-08 Multi-Stage Fracture 1793.30 1793.40 0
2019-01-08 Multi-Stage Fracture 1767.30 1767.40 0
2019-01-08 Multi-Stage Fracture 1739.80 1739.90 0
2019-01-09 Multi-Stage Fracture 1704.00 1704.10 0
2019-01-09 Multi-Stage Fracture 1679.00 1679.10 0
2019-01-09 Multi-Stage Fracture 1642.30 1642.40 0
2019-01-08 Multi-Stage Fracture 2202.70 2202.80 0
2019-01-09 Multi-Stage Fracture 1616.80 1616.90 0
2019-01-09 Multi-Stage Fracture 1580.30 1580.40 0
2019-01-09 Multi-Stage Fracture 1543.20 1543.30 0
2019-01-09 Multi-Stage Fracture 1490.50 1490.60 0
2019-01-09 Multi-Stage Fracture 1464.40 1464.50 0
2019-01-09 Multi-Stage Fracture 1427.30 1427.40 0
2019-01-09 Multi-Stage Fracture 1403.10 1403.20 0
2019-01-09 Multi-Stage Fracture 1365.40 1365.50 0
2019-01-09 Multi-Stage Fracture 1339.70 1339.80 0
2019-01-09 Multi-Stage Fracture 1315.60 1315.70 0
2019-01-08 Multi-Stage Fracture 2176.50 2176.60 0
2019-01-09 Multi-Stage Fracture 1276.60 1276.70 0
2019-01-09 Multi-Stage Fracture 1163.40 1163.50 0
2019-01-09 Multi-Stage Fracture 1138.80 1138.90 0
2019-01-09 Multi-Stage Fracture 1110.80 1110.90 0
2019-01-09 Multi-Stage Fracture 1070.20 1070.30 0
2019-01-09 Multi-Stage Fracture 1042.20 1042.30 0
2019-01-09 Multi-Stage Fracture 1016.80 1016.90 0
2019-01-09 Multi-Stage Fracture 979.80 979.90 0
2019-01-09 Multi-Stage Fracture 952.60 952.70 0
2019-01-09 Multi-Stage Fracture 927.60 927.70 0
2019-01-08 Multi-Stage Fracture 2150.40 2150.50 0
2019-01-09 Multi-Stage Fracture 902.10 902.20 0
2019-01-08 Multi-Stage Fracture 2110.90 2111.00 0
2019-01-08 Multi-Stage Fracture 2084.60 2084.70 0
2019-01-08 Multi-Stage Fracture 2046.90 2047.00 0
2019-01-08 Multi-Stage Fracture 2019.60 2019.70 0
2019-01-08 Multi-Stage Fracture 1994.20 1994.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-01-08 2019-01-09 753 1,898 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 74.6074 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 12.375 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0858 N/A
water 7732-18-5 100 0.0858 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0352 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1491 N/A
Ethylene glycol 107-21-1 100 0.1491 N/A
Potassium Carbonate 584-08-7 100 0.1491 N/A
Potassium Hydroxide 1310-58-3 100 0.1491 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.3133 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0587 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0587 N/A
water 7732-18-5 100 0.0587 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-01-02 2019-01-07 Surface Water - Runoff 1914

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 8709 0.0 0.0 0.0
2020 2163 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-11-09 No Incident Encountered 0.00 0.00
2019-01-01 No Incident Encountered 0.00 0.00

For data sources see[10]

References