X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344082008070

Well Details

Well ID: 0344082008070
Loading map...
Location: 07/08-20-034-08W4/0
Location Alias: 07/08-20-34-08 W4M
Location Alias 2: 07/08-20-034-08 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 08
Section: 20
County/Municipality: Special Areas No. 4
Well Name: TAC 14-16 HZ 107 PROVOST 8-20-34-8
Operator Name: Tamarack Acquisition Corp.
License Number: 0494270
License Date: 2019-04-22
License Status: Issued
Spud Date: 2019-05-24
Final Drill Date: 2019-06-23
Well Total Depth: 1936.00 m
Surface Hole Latitude: 51.922997
Surface Hole Longitude: -111.084324

For data sources see[1][2]

Well History

Date Event
2019-04-22 Obtained License
2019-05-23 Set Surface
2019-05-24 Surface Casing Operation Performed
2019-06-22 Direction Drilling Operation Performed - Deviate
2019-06-22 Direction Drilling Operation Performed - Horizontal
2019-06-22 Drill To LD
2019-06-22 Production Casing Operation Performed
2019-06-22 Well Log Performed
2019-06-23 Finished Drilling
2019-06-23 Rig Released
2019-06-23 Well Log Performed
2019-06-23 Well Mode changed to Drilled and Cased
2019-07-03 Perforation Treatment Performed - Jet Perforation
2019-07-11 Perforation Treatment Performed - Fractured
2019-08-01 Well Began Production
2019-08-01 Well Fluid changed to Crude Oil
2019-08-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-06-22 Tempco Drilling Company Inc. 5 Drill To LD
2019-05-23 Predator Drilling Inc. 27 Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-06-22 205.80 Deviate (5 - 79 degrees)
2019-06-22 1024.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-07-03 Perforation 1906.00 1906.50 20
2019-07-03 Perforation 1606.00 1606.50 20
2019-07-03 Perforation 1572.00 1572.50 20
2019-07-03 Perforation 1538.00 1538.50 20
2019-07-03 Perforation 1501.00 1501.50 20
2019-07-03 Perforation 1467.00 1467.50 20
2019-07-03 Perforation 1423.00 1423.50 20
2019-07-03 Perforation 1375.00 1375.50 20
2019-07-03 Perforation 1329.00 1329.50 20
2019-07-03 Perforation 1295.00 1295.50 20
2019-07-03 Perforation 1261.00 1261.50 20
2019-07-03 Perforation 1880.00 1880.50 20
2019-07-03 Perforation 1227.00 1227.50 20
2019-07-03 Perforation 1193.00 1193.50 20
2019-07-03 Perforation 1159.00 1159.50 20
2019-07-03 Perforation 1125.00 1125.50 20
2019-07-03 Perforation 1091.00 1091.50 20
2019-07-11 Fracture 1906.00 1906.50 0
2019-07-11 Fracture 1880.00 1880.50 0
2019-07-11 Fracture 1844.00 1844.50 0
2019-07-11 Fracture 1810.00 1810.50 0
2019-07-11 Fracture 1776.00 1776.50 0
2019-07-03 Perforation 1844.00 1844.50 20
2019-07-11 Fracture 1742.00 1742.50 0
2019-07-11 Fracture 1708.00 1708.50 0
2019-07-11 Fracture 1674.00 1674.50 0
2019-07-11 Fracture 1640.00 1640.50 0
2019-07-11 Fracture 1606.00 1606.50 0
2019-07-11 Fracture 1572.00 1572.50 0
2019-07-11 Fracture 1538.00 1538.50 0
2019-07-11 Fracture 1501.00 1501.50 0
2019-07-11 Fracture 1467.00 1467.50 0
2019-07-11 Fracture 1423.00 1423.50 0
2019-07-03 Perforation 1810.00 1810.50 20
2019-07-11 Fracture 1329.00 1329.50 0
2019-07-11 Fracture 1295.00 1295.50 0
2019-07-11 Fracture 1261.00 1261.50 0
2019-07-11 Fracture 1227.00 1227.50 0
2019-07-11 Fracture 1193.00 1193.50 0
2019-07-11 Fracture 1159.00 1159.50 0
2019-07-11 Fracture 1125.00 1125.50 0
2019-07-11 Fracture 1091.00 1091.50 0
2019-07-03 Perforation 1776.00 1776.50 20
2019-07-03 Perforation 1742.00 1742.50 20
2019-07-03 Perforation 1708.00 1708.50 20
2019-07-03 Perforation 1674.00 1674.50 20
2019-07-03 Perforation 1640.00 1640.50 20

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-07-11 2019-07-11 880 678 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 84.5513 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 10.2826 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.1118 N/A
water 7732-18-5 100 0.1118 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0202 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1743 N/A
Ethylene glycol 107-21-1 100 0.1743 N/A
Potassium Carbonate 584-08-7 100 0.1743 N/A
Potassium Hydroxide 1310-58-3 100 0.1743 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.3139 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0749 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0749 N/A
water 7732-18-5 100 0.0749 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-07-02 2019-07-11 Oilfield Produced Water 624
2019-07-04 2019-07-10 Oilfield Produced Water 59
2019-07-03 2019-07-06 Oilfield Produced Water 8
2019-07-02 2019-07-02 Central Water Distribution Facility 11
2019-07-03 2019-07-10 Central Water Distribution Facility 35

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 3653 0.0 0.0 0.0
2020 2175 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-06-23 No Incident Encountered 0.00 0.00
2019-07-11 No Incident Encountered 0.00 0.00

For data sources see[10]

References