X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344083413000

Well Details

Well ID: 0344083413000
Loading map...
Location: 00/13-34-034-08W4/0
Location Alias: 00/13-34-34-08 W4M
Location Alias 2: 00/13-34-034-08 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 08
Section: 34
County/Municipality: Special Areas No. 4
Well Name: TAC PROVOST 13-34-34-8
Operator Name: Tamarack Acquisition Corp.
License Number: 0491950
License Date: 2018-11-09
License Status: Issued
Spud Date: 2019-05-10
Final Drill Date: 2019-05-14
Well Total Depth: 2399.00 m
Surface Hole Latitude: 51.967610
Surface Hole Longitude: -111.043313

For data sources see[1][2]

Well History

Date Event
2018-11-09 Obtained License
2019-05-11 Drill To LD
2019-05-11 Surface Casing Operation Performed
2019-05-12 Direction Drilling Operation Performed - Deviate
2019-05-12 Direction Drilling Operation Performed - Horizontal
2019-05-14 Finished Drilling
2019-05-14 Well Log Performed
2019-05-14 Well Mode changed to Drilled and Cased
2019-05-15 Production Casing Operation Performed
2019-05-15 Rig Released
2019-05-16 Well Log Performed
2019-05-20 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-21 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-24 Well Began Production
2019-05-24 Well Fluid changed to Crude Oil
2019-05-24 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-05-11 Precision Drilling Corporation 292 Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-05-12 644.70 Deviate (5 - 79 degrees)
2019-05-12 975.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-05-20 Multi-Stage Fracture 2337.50 2337.60 0
2019-05-20 Multi-Stage Fracture 2039.10 2039.20 0
2019-05-20 Multi-Stage Fracture 2010.60 2010.70 0
2019-05-20 Multi-Stage Fracture 1982.80 1982.90 0
2019-05-20 Multi-Stage Fracture 1954.50 1954.60 0
2019-05-20 Multi-Stage Fracture 1912.50 1912.60 0
2019-05-20 Multi-Stage Fracture 1856.70 1856.80 0
2019-05-20 Multi-Stage Fracture 1814.00 1814.10 0
2019-05-20 Multi-Stage Fracture 1785.40 1785.50 0
2019-05-20 Multi-Stage Fracture 1757.00 1757.10 0
2019-05-21 Multi-Stage Fracture 1686.50 1686.60 0
2019-05-20 Multi-Stage Fracture 2309.20 2309.30 0
2019-05-21 Multi-Stage Fracture 1658.70 1658.80 0
2019-05-21 Multi-Stage Fracture 1616.30 1616.40 0
2019-05-21 Multi-Stage Fracture 1588.10 1588.20 0
2019-05-21 Multi-Stage Fracture 1559.40 1559.50 0
2019-05-21 Multi-Stage Fracture 1516.90 1517.00 0
2019-05-21 Multi-Stage Fracture 1488.50 1488.60 0
2019-05-21 Multi-Stage Fracture 1460.30 1460.40 0
2019-05-21 Multi-Stage Fracture 1418.00 1418.10 0
2019-05-21 Multi-Stage Fracture 1389.60 1389.70 0
2019-05-21 Multi-Stage Fracture 1360.90 1361.00 0
2019-05-20 Multi-Stage Fracture 2280.90 2281.00 0
2019-05-21 Multi-Stage Fracture 1317.80 1317.90 0
2019-05-21 Multi-Stage Fracture 1289.10 1289.20 0
2019-05-21 Multi-Stage Fracture 1263.70 1263.80 0
2019-05-21 Multi-Stage Fracture 1235.40 1235.50 0
2019-05-21 Multi-Stage Fracture 1196.30 1196.40 0
2019-05-21 Multi-Stage Fracture 1168.50 1168.60 0
2019-05-21 Multi-Stage Fracture 1126.10 1126.20 0
2019-05-21 Multi-Stage Fracture 1097.50 1097.60 0
2019-05-21 Multi-Stage Fracture 1068.80 1068.90 0
2019-05-21 Multi-Stage Fracture 1040.10 1040.20 0
2019-05-20 Multi-Stage Fracture 2252.10 2252.20 0
2019-05-21 Multi-Stage Fracture 970.20 970.30 0
2019-05-20 Multi-Stage Fracture 2223.40 2223.50 0
2019-05-20 Multi-Stage Fracture 2180.80 2180.90 0
2019-05-20 Multi-Stage Fracture 2138.30 2138.40 0
2019-05-20 Multi-Stage Fracture 2109.90 2110.00 0
2019-05-20 Multi-Stage Fracture 2067.80 2067.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-05-20 2019-05-21 859 1,577 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 73.1982 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 13.0795 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0451 N/A
water 7732-18-5 100 0.0451 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.029 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1491 N/A
Ethylene glycol 107-21-1 100 0.1491 N/A
Potassium Carbonate 584-08-7 100 0.1491 N/A
Potassium Hydroxide 1310-58-3 100 0.1491 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.3458 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0735 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0735 N/A
water 7732-18-5 100 0.0735 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-05-17 2019-05-19 Surface Water - Runoff 1650

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 5228 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-05-10 No Incident Encountered 0.00 0.00
2019-05-16 No Incident Encountered 0.00 0.00

For data sources see[10]

References