X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344091111000

Well Details

Well ID: 0344091111000
Loading map...
Location: 00/11-11-034-09W4/0
Location Alias: 00/11-11-34-09 W4M
Location Alias 2: 00/11-11-034-09 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 09
Section: 11
County/Municipality: Special Areas No. 4
Well Name: ENERPLUS CPC SUN PROVOST 11-11-34-9
Operator Name: Enerplus Corporation
License Number: 0030931
License Date: 1966-09-06
License Status: RecCertified
Spud Date: 1966-09-13
Final Drill Date: 1966-09-17
Well Total Depth: 912.90 m
Surface Hole Latitude: 51.905449
Surface Hole Longitude: -111.177280

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-09-06 Obtained License
1966-09-17 Finished Drilling
1966-09-18 Production Casing Operation Performed
1966-10-14 Perforation Treatment Performed - Jet Perforation
1967-03-21 Well Mode changed to Drilled and Cased
1973-10-21 Perforation Treatment Performed - Jet Perforation
1973-11-10 Perforation Treatment Performed - Fractured
1973-11-28 Perforation Treatment Performed - Condensate Squeeze
1974-02-21 Well Began Injection
1974-02-21 Well Fluid changed to Water
1974-02-21 Well Type changed to Injection
1986-02-17 Well Fluid changed to Water
1986-02-17 Well Mode changed to Suspended
1986-02-17 Well Type changed to Injection
1991-06-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-06-24 Perforation Treatment Performed - Selective Jet Perforations
1991-06-24 Plug Back Performed
1991-08-06 Perforation Treatment Performed - Remedial Casing
1991-08-06 Well Fluid changed to Water
1991-08-06 Well Mode changed to Abandoned
1991-08-06 Well Type changed to Injection
1991-09-05 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-10-14 Perforation 892.80 897.30 13
1973-10-21 Perforation 894.90 897.30 13
1973-11-10 Fracture 894.90 897.30 0
1973-11-28 Condensate Squeeze 892.80 897.30 0
1991-06-24 Packing Device Capped w/Cement 872.00 880.00 0
1991-06-24 Selective Jet Perforations 270.00 270.00 4
1991-08-06 Remedial Casing Cementing 270.00 270.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0

For data sources see[5]

References