If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0344091602000 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/02-16-034-09W4/0 | |
Location Alias: 00/02-16-34-09 W4M | |
Location Alias 2: 00/02-16-034-09 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 4 | |
Range: 09 | |
Section: 16 | |
County/Municipality: Special Areas No. 4 | |
Well Name: ENERPLUS UNIT PROVOST 2-16-34-9 | |
Operator Name: Enerplus Corporation | |
License Number: 0054272 | |
License Date: 1975-07-18 | |
License Status: RecCertified | |
Spud Date: 1975-07-20 | |
Final Drill Date: 1975-07-22 | |
Well Total Depth: 915.60 m | |
Surface Hole Latitude: 51.913591 | |
Surface Hole Longitude: -111.219441 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1975-07-18 | Obtained License |
1975-07-22 | Finished Drilling |
1975-07-22 | Well Mode changed to Drilled and Cased |
1975-07-23 | Production Casing Operation Performed |
1975-08-20 | Perforation Treatment Performed - Jet Perforation |
1975-09-29 | Perforation Treatment Performed - Fractured |
1975-10-16 | Well Began Injection |
1975-10-16 | Well Fluid changed to Water |
1975-10-16 | Well Type changed to Injection |
1986-02-17 | Well Fluid changed to Water |
1986-02-17 | Well Mode changed to Suspended |
1986-02-17 | Well Type changed to Injection |
1990-09-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-09-25 | Plug Back Performed |
1990-09-25 | Well Fluid changed to Water |
1990-09-25 | Well Mode changed to Abandoned |
1990-09-25 | Well Type changed to Injection |
1990-10-23 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1975-08-20 | Perforation | 892.10 | 894.00 | 13 |
1975-09-29 | Fracture | 892.10 | 894.00 | 0 |
1990-09-25 | Packing Device Capped w/Cement | 868.00 | 876.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1975 | 0 | 0.0 | 0.0 | 0.0 |
1976 | 0 | 0.0 | 0.0 | 0.0 |
1977 | 0 | 0.0 | 0.0 | 0.0 |
1978 | 0 | 0.0 | 0.0 | 0.0 |
1979 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]