If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0344092606020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.946796,"lon":-111.175276,"icon":""}]} |
| Location: 02/06-26-034-09W4/0 | |
| Location Alias: 02/06-26-34-09 W4M | |
| Location Alias 2: 02/06-26-034-09 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 034 | |
| Meridian: 4 | |
| Range: 09 | |
| Section: 26 | |
| County/Municipality: Special Areas No. 4 | |
| Well Name: ACL 102 PROVOST 6-26-34-9 | |
| Operator Name: Battle River Energy Ltd. | |
| License Number: 0468579 | |
| License Date: 2014-07-29 | |
| License Status: Amended | |
| Spud Date: 2014-08-29 | |
| Final Drill Date: 2014-09-06 | |
| Well Total Depth: 1117.00 m | |
| Surface Hole Latitude: 51.946796 | |
| Surface Hole Longitude: -111.175276 |
| Date | Event |
|---|---|
| 2014-07-29 | Obtained License |
| 2014-08-30 | Well Log Performed |
| 2014-09-04 | Surface Casing Operation Performed |
| 2014-09-05 | Direction Drilling Operation Performed - Deviate |
| 2014-09-06 | Finished Drilling |
| 2014-09-06 | Well Log Performed |
| 2014-09-06 | Well Mode changed to Drilled and Cased |
| 2014-09-07 | Production Casing Operation Performed |
| 2014-09-07 | Rig Released |
| 2014-09-17 | Perforation Treatment Performed - Jet Perforation |
| 2014-10-06 | Well Began Production |
| 2014-10-06 | Well Fluid changed to Crude Oil |
| 2014-10-06 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2014-08-29 | Bonanza Drilling Inc. | 2 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2014-09-05 | 834.00 | Deviate (5 - 79 degrees) |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2014-09-17 | Perforation | 1094.50 | 1096.50 | 17 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2014 | 1973 | 0.0 | 0.0 | 0.0 |
| 2015 | 8326 | 0.0 | 0.0 | 0.0 |
| 2016 | 8085 | 0.0 | 0.0 | 0.0 |
| 2017 | 7579 | 0.0 | 0.0 | 0.0 |
| 2018 | 8677 | 0.0 | 0.0 | 0.0 |
| 2019 | 8628 | 0.0 | 0.0 | 0.0 |
| 2020 | 2158 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2014-09-21 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]