If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0344092610000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.947992,"lon":-111.175236,"icon":""}]} |
| Location: 00/10-26-034-09W4/0 | |
| Location Alias: 00/10-26-34-09 W4M | |
| Location Alias 2: 00/10-26-034-09 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 034 | |
| Meridian: 4 | |
| Range: 09 | |
| Section: 26 | |
| County/Municipality: Special Areas No. 4 | |
| Well Name: 131ALB PROVOST 10-26-34-9 | |
| Operator Name: Battle River Energy Ltd. | |
| License Number: 0451634 | |
| License Date: 2012-12-10 | |
| License Status: Issued | |
| Spud Date: 2012-12-16 | |
| Final Drill Date: 2012-12-18 | |
| Well Total Depth: 1132.00 m | |
| Surface Hole Latitude: 51.947992 | |
| Surface Hole Longitude: -111.175236 |
| Date | Event |
|---|---|
| 2012-12-10 | Obtained License |
| 2012-12-16 | Surface Casing Operation Performed |
| 2012-12-17 | Direction Drilling Operation Performed - Deviate |
| 2012-12-18 | Finished Drilling |
| 2012-12-18 | Well Log Performed |
| 2012-12-18 | Well Mode changed to Drilled and Cased |
| 2012-12-19 | Production Casing Operation Performed |
| 2012-12-19 | Rig Released |
| 2013-01-04 | Perforation Treatment Performed - Jet Perforation |
| 2013-03-01 | Well Began Production |
| 2013-03-01 | Well Fluid changed to Crude Oil |
| 2013-03-01 | Well Mode changed to Pumping |
| 2016-04-30 | Well Fluid changed to Crude Oil |
| 2016-04-30 | Well Mode changed to Suspended |
| 2019-11-30 | Well Fluid changed to Crude Oil |
| 2019-11-30 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-12-16 | Bonanza Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-12-17 | 744.30 | Deviate (5 - 79 degrees) |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2013-01-04 | Perforation | 1087.80 | 1088.80 | 17 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2013 | 5834 | 0.0 | 0.0 | 0.0 |
| 2014 | 7820 | 0.0 | 0.0 | 0.0 |
| 2015 | 1218 | 0.0 | 0.0 | 0.0 |
| 2019 | 402 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-12-21 | No Incident Encountered | 0.00 | 0.00 |
| 2013-01-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]