X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344161710000

Well Details

Well ID: 0344161710000
Loading map...
Location: 00/10-17-034-16W4/0
Location Alias: 00/10-17-34-16 W4M
Location Alias 2: 00/10-17-034-16 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 16
Section: 17
County/Municipality: County of Stettler No. 6
Well Name: CS SULPETRO FARRELL 10-17-34-16
Operator Name: CNOOC Petroleum North America ULC
License Number: 0040580
License Date: 1971-08-15
License Status: RecCertified
Spud Date: 1971-08-21
Final Drill Date: 1971-08-26
Well Total Depth: 1185.70 m
Surface Hole Latitude: 51.921004
Surface Hole Longitude: -112.233026

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1971-08-15 Obtained License
1971-08-26 Finished Drilling
1971-08-27 Drill Stem Test Performed
1971-08-28 Drill Stem Test Performed
1971-08-30 Production Casing Operation Performed
1971-09-24 Perforation Treatment Performed - Jet Perforation
1971-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-09-27 Perforation Treatment Performed - Fractured
1971-10-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1971-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-10-07 Perforation Treatment Performed - Jet Perforation
1972-10-31 Well Mode changed to Drilled and Cased
1983-01-19 Well Began Production
1983-01-19 Well Fluid changed to Gas
1983-01-19 Well Mode changed to Flowing
1988-07-30 Well Fluid changed to Gas
1988-07-30 Well Mode changed to Suspended
1989-06-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-06-28 Plug Back Performed
1989-06-28 Well Fluid changed to Gas
1989-06-28 Well Mode changed to Abandoned
1989-06-29 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1971-09-24 Perforation 1160.70 1163.70 7
1971-09-25 Acid Treatment 1160.70 1163.70 0
1971-09-27 Fracture 1160.70 1163.70 0
1971-10-06 Packing Device Capped w/Cement 1130.80 1139.30 0
1971-10-07 Perforation 1032.10 1033.90 7
1971-10-07 Acid Treatment 1032.10 1033.90 0
1989-06-28 Packing Device Capped w/Cement 1016.00 1024.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 2354 0.0 0.0 0.0
1984 1443 0.0 0.0 0.0
1985 2680 0.0 0.0 0.0
1986 2208 0.0 0.0 0.0
1987 3546 0.0 0.0 0.0
1988 4381 0.0 0.0 0.0

For data sources see[5]

References