If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0344202106020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.930102,"lon":-112.78244,"icon":""}]} |
Location: 02/06-21-034-20W4/0 | |
Location Alias: 02/06-21-34-20 W4M | |
Location Alias 2: 02/06-21-034-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 4 | |
Range: 20 | |
Section: 21 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: 981384 RICH 6-21-34-20 | |
Operator Name: Trident Exploration (Alberta) Corp. | |
License Number: 0434046 | |
License Date: 2011-06-03 | |
License Status: Issued | |
Spud Date: 2011-09-15 | |
Final Drill Date: 2011-09-16 | |
Well Total Depth: 434.60 m | |
Surface Hole Latitude: 51.930102 | |
Surface Hole Longitude: -112.782440 |
Date | Event |
---|---|
2011-06-03 | Obtained License |
2011-09-15 | Surface Casing Operation Performed |
2011-09-16 | Finished Drilling |
2011-09-16 | Production Casing Operation Performed |
2011-09-16 | Rig Released |
2011-09-16 | Well Mode changed to Drilled and Cased |
2011-10-15 | Well Log Performed |
2011-11-17 | Perforation Treatment Performed - Jet Perforation |
2011-11-17 | Well Log Performed |
2012-01-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-01 | Well Began Production |
2012-02-01 | Well Fluid changed to Coalbed Methane-Coals Only |
2012-02-01 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-11-17 | Perforation | 397.00 | 398.00 | 13 |
2011-11-17 | Perforation | 257.60 | 258.50 | 13 |
2011-11-17 | Perforation | 259.00 | 260.00 | 13 |
2011-11-17 | Perforation | 246.50 | 247.20 | 13 |
2011-11-17 | Perforation | 241.50 | 242.00 | 13 |
2011-11-17 | Perforation | 243.00 | 244.00 | 13 |
2011-11-17 | Perforation | 235.00 | 237.00 | 13 |
2011-11-17 | Perforation | 224.50 | 225.50 | 13 |
2011-11-17 | Perforation | 209.00 | 209.50 | 13 |
2011-11-17 | Perforation | 202.50 | 203.70 | 13 |
2011-11-17 | Perforation | 193.20 | 194.00 | 13 |
2011-11-17 | Perforation | 343.00 | 343.70 | 13 |
2011-11-17 | Perforation | 187.30 | 187.70 | 13 |
2012-01-26 | Multi-Stage Fracture | 394.00 | 400.00 | 0 |
2012-01-26 | Multi-Stage Fracture | 340.00 | 346.00 | 0 |
2012-01-26 | Multi-Stage Fracture | 325.00 | 331.00 | 0 |
2012-01-26 | Multi-Stage Fracture | 303.00 | 309.00 | 0 |
2012-01-26 | Multi-Stage Fracture | 289.00 | 295.00 | 0 |
2012-01-26 | Multi-Stage Fracture | 274.50 | 280.50 | 0 |
2012-01-26 | Multi-Stage Fracture | 269.00 | 275.00 | 0 |
2012-01-26 | Multi-Stage Fracture | 256.00 | 262.00 | 0 |
2012-01-26 | Multi-Stage Fracture | 245.50 | 251.50 | 0 |
2011-11-17 | Perforation | 326.50 | 328.00 | 13 |
2012-01-26 | Multi-Stage Fracture | 239.50 | 245.50 | 0 |
2012-01-26 | Multi-Stage Fracture | 232.50 | 238.50 | 0 |
2012-01-26 | Multi-Stage Fracture | 221.00 | 227.00 | 0 |
2012-01-26 | Multi-Stage Fracture | 205.00 | 211.00 | 0 |
2012-01-26 | Multi-Stage Fracture | 199.00 | 205.00 | 0 |
2012-01-26 | Multi-Stage Fracture | 190.00 | 196.00 | 0 |
2012-01-26 | Multi-Stage Fracture | 184.00 | 190.00 | 0 |
2011-11-17 | Perforation | 329.00 | 330.00 | 13 |
2011-11-17 | Perforation | 305.00 | 307.50 | 13 |
2011-11-17 | Perforation | 291.20 | 292.80 | 13 |
2011-11-17 | Perforation | 276.50 | 277.40 | 13 |
2011-11-17 | Perforation | 270.50 | 271.00 | 13 |
2011-11-17 | Perforation | 272.00 | 272.80 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 8039 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8039 | 0.0 | 0.0 | 0.0 |
2019 | 2879 | 0.0 | 0.0 | 0.0 |
For data sources see[5]