X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344263208000

Well Details

Well ID: 0344263208000
Loading map...
Location: 00/08-32-034-26W4/0
Location Alias: 00/08-32-34-26 W4M
Location Alias 2: 00/08-32-034-26 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 26
Section: 32
County/Municipality: Red Deer County
Well Name: Vantage WIM 8-32-34-26
Operator Name: Vantage Point Resources Inc.
License Number: 0215801
License Date: 1998-06-11
License Status: Suspension
Spud Date: 1998-07-08
Final Drill Date: 1998-07-23
Well Total Depth: 2296.00 m
Surface Hole Latitude: 51.959962
Surface Hole Longitude: -113.643576

For data sources see[1][2]

Well History

Date Event
1998-06-11 Obtained License
1998-07-10 Surface Casing Operation Performed
1998-07-12 Drill Stem Test Performed
1998-07-23 Finished Drilling
1998-07-23 Well Log Performed
1998-07-23 Well Mode changed to Drilled and Cased
1998-07-24 Drill Stem Test Performed
1998-07-26 Production Casing Operation Performed
1998-07-26 Rig Released
1998-08-07 Perforation Treatment Performed - Jet Perforation
1998-08-07 Well Log Performed
1998-08-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-08-23 Well Began Production
1998-08-23 Well Fluid changed to Crude Oil
1998-08-23 Well Mode changed to Pumping
2000-02-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-10-25 Well Fluid changed to Crude Oil
2001-10-25 Well Log Performed
2001-10-25 Well Mode changed to Suspended
2001-10-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-10-26 Plug Back Performed
2001-10-26 Well Fluid changed to Crude Oil
2001-10-26 Well Mode changed to Abandoned Zone
2003-01-03 Well Log Performed
2003-01-26 Well Fluid changed to Crude Oil
2003-01-26 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-08-07 Perforation 2261.00 2266.50 13
1998-08-10 Acid Treatment 2261.00 2266.50 0
2000-02-11 Acid Treatment 2261.00 2266.50 0
2001-10-26 Packing Device Capped w/Cement 2252.00 2260.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 2506 0.0 0.0 0.0
1999 7405 0.0 0.0 0.0
2000 7005 0.0 0.0 0.0
2001 5443 0.0 0.0 0.0

For data sources see[5]

References