X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0345030203000

Well Details

Well ID: 0345030203000
Loading map...
Location: 00/03-02-034-03W5/0
Location Alias: 00/03-02-34-03 W5M
Location Alias 2: 00/03-02-034-03 W5/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 5
Range: 03
Section: 02
County/Municipality: Mountain View County
Well Name: DEKALB GARRINGTON 3-2-34-3
Operator Name: Dekalb Petroleum Corporation
License Number: 0076534
License Date: 1979-06-22
License Status: RecCertified
Spud Date: 1979-09-04
Final Drill Date: 1979-10-01
Well Total Depth: 2423.00 m
Surface Hole Latitude: 51.885850
Surface Hole Longitude: -114.325641

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-06-22 Obtained License
1979-10-01 Finished Drilling
1979-10-01 Well Mode changed to Drilled and Cased
1979-10-02 Well Log Performed
1979-10-03 Drill Stem Test Performed
1979-10-04 Drill Stem Test Performed
1979-10-06 Production Casing Operation Performed
1979-10-08 Well Began Production
1979-10-08 Well Fluid changed to Crude Oil
1979-10-08 Well Mode changed to Flowing
1979-10-30 Perforation Treatment Performed - Jet Perforation
1979-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-05 Well Fluid changed to Crude Oil
1981-01-05 Well Mode changed to Suspended
1981-01-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-01-09 Perforation Treatment Performed - Jet Perforation
1981-01-14 Perforation Treatment Performed - Cement Squeeze
1981-01-15 Perforation Treatment Performed - Cement Squeeze
1981-01-20 Perforation Treatment Performed - Jet Perforation
1981-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-29 Perforation Treatment Performed - Cement Squeeze
1981-01-30 Perforation Treatment Performed - Cement Squeeze
1981-02-01 Perforation Treatment Performed - Jet Perforation
1981-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-05-08 Well Log Performed
1984-05-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-05-09 Perforation Treatment Performed - Jet Perforation
1984-05-09 Plug Back Performed
1984-05-11 Perforation Treatment Performed - Cement Squeeze
1984-05-14 Well Log Performed
1984-05-16 Well Log Performed
1984-05-17 Perforation Treatment Performed - Jet Perforation
1984-06-01 Well Log Performed
1984-08-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-08-16 Well Fluid changed to Crude Oil
1984-08-16 Well Mode changed to Abandoned
1984-08-17 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-10-30 Perforation 2399.50 2401.00 7
1981-01-29 Cement Squeeze 2382.00 2386.00 0
1981-01-30 Cement Squeeze 2382.00 2386.00 0
1981-02-01 Perforation 2382.00 2386.00 7
1981-02-03 Acid Treatment 2382.00 2386.00 0
1984-05-09 Packing Device Capped w/Cement 2360.00 2368.00 0
1984-05-09 Perforation 1425.00 1425.30 13
1984-05-09 Perforation 1375.00 1375.30 13
1984-05-11 Cement Squeeze 1375.00 1425.30 0
1984-05-17 Perforation 1392.00 1394.00 13
1984-08-16 Packing Device Capped w/Cement 1348.00 1356.00 0
1979-10-30 Perforation 2404.00 2405.00 7
1979-10-31 Acid Treatment 2399.50 2405.00 0
1981-01-09 Packing Device Capped w/Cement 2397.00 2397.00 0
1981-01-09 Perforation 2382.00 2386.00 7
1981-01-14 Cement Squeeze 2382.00 2386.00 0
1981-01-15 Cement Squeeze 2382.00 2386.00 0
1981-01-20 Perforation 2382.00 2386.00 7
1981-01-22 Acid Treatment 2382.00 2386.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 302 0.0 0.0 0.0
1980 3594 0.0 0.0 0.0

For data sources see[5]

References