X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0345030310000

Well Details

Well ID: 0345030310000
Loading map...
Location: 00/10-03-034-03W5/0
Location Alias: 00/10-03-34-03 W5M
Location Alias 2: 00/10-03-034-03 W5/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 5
Range: 03
Section: 03
County/Municipality: Mountain View County
Well Name: NAL GARR 10-3-34-3
Operator Name: NAL Resources Limited
License Number: 0073178
License Date: 1978-11-27
License Status: Issued
Spud Date: 1979-01-09
Final Drill Date: 1979-01-28
Well Total Depth: 2370.00 m
Surface Hole Latitude: 51.892589
Surface Hole Longitude: -114.339690

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-11-27 Obtained License
1979-01-28 Finished Drilling
1979-01-28 Well Log Performed
1979-01-28 Well Mode changed to Drilled and Cased
1979-01-30 Production Casing Operation Performed
1979-02-22 Perforation Treatment Performed - Jet Perforation
1979-02-23 Perforation Treatment Performed - Fractured
1979-04-07 Well Began Production
1979-04-07 Well Fluid changed to Crude Oil
1979-04-07 Well Mode changed to Flowing
1996-02-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-02-08 Plug Back Performed
1996-02-08 Well Fluid changed to Crude Oil
1996-02-08 Well Mode changed to Suspended
1996-02-09 Perforation Treatment Performed - Jet Perforation
1996-02-09 Well Fluid changed to Crude Oil
1996-02-09 Well Mode changed to Abandoned Zone
1996-02-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-02-16 Perforation Treatment Performed - Fractured
2000-07-24 Perforation Treatment Performed - Jet Perforation
2000-07-25 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-02-22 Perforation 2329.00 2333.50 6
1979-02-23 Fracture 2329.00 2333.50 0
1996-02-08 Packing Device Capped w/Cement 2288.00 2296.00 0
1996-02-09 Perforation 1870.00 1872.00 13
1996-02-11 Acid Treatment 1870.00 1872.00 0
1996-02-13 Acid Treatment 1870.00 1872.00 0
1996-02-16 Fracture 1870.00 1872.00 0
2000-07-24 Perforation 1870.00 1872.00 14
2000-07-25 Chemical Squeeze 1870.00 1872.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 4309 0.0 0.0 0.0
1980 8346 0.0 0.0 0.0
1981 8725 0.0 0.0 0.0
1982 8620 0.0 0.0 0.0
1983 8483 0.0 0.0 0.0
1984 8269 0.0 0.0 0.0
1985 8373 0.0 0.0 0.0
1986 8510 0.0 0.0 0.0
1987 8337 0.0 0.0 0.0
1988 8439 0.0 0.0 0.0
1989 8675 0.0 0.0 0.0
1990 8424 0.0 0.0 0.0
1991 8684 0.0 0.0 0.0
1992 8615 0.0 0.0 0.0
1993 8519 0.0 0.0 0.0
1994 8134 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 744 0.0 0.0 0.0

For data sources see[5]

References