X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0345041516000

Well Details

Well ID: 0345041516000
Loading map...
Location: 00/16-15-034-04W5/0
Location Alias: 00/16-15-34-04 W5M
Location Alias 2: 00/16-15-034-04 W5/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 5
Range: 04
Section: 15
County/Municipality: Mountain View County
Well Name: NAL CAROL 16-15-34-4
Operator Name: NAL Resources Limited
License Number: 0443151
License Date: 2012-01-20
License Status: Suspension
Spud Date: 2012-02-09
Final Drill Date: 2012-02-21
Well Total Depth: 3320.00 m
Surface Hole Latitude: 51.912659
Surface Hole Longitude: -114.480991

For data sources see[1][2]

Well History

Date Event
2012-01-20 Obtained License
2012-02-10 Surface Casing Operation Performed
2012-02-13 Well Log Performed
2012-02-14 Direction Drilling Operation Performed - Horizontal
2012-02-17 Intermediate Casing Operation Performed
2012-02-21 Finished Drilling
2012-02-21 Well Mode changed to Drilled and Cased
2012-02-22 Liner Casing Operation Performed
2012-02-22 Perforation Treatment Performed - Open-Hole Completion
2012-02-23 Rig Released
2012-02-25 Well Log Performed
2012-03-01 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-19 Well Began Production
2012-03-19 Well Fluid changed to Crude Oil
2012-03-19 Well Mode changed to Pumping
2016-02-01 Well Fluid changed to Crude Oil
2016-02-01 Well Mode changed to Suspended
2019-04-24 Well Fluid changed to Crude Oil
2019-04-24 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-09 Nabors Drilling Limited 8 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-14 1746.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-22 Open Hole/Barefoot Completion 3312.00 3320.00 0
2012-03-01 Multi-Stage Fracture 2655.30 2655.40 0
2012-03-01 Multi-Stage Fracture 2579.40 2579.50 0
2012-03-01 Multi-Stage Fracture 2504.10 2504.20 0
2012-03-01 Multi-Stage Fracture 2429.30 2429.40 0
2012-03-01 Multi-Stage Fracture 2353.70 2353.80 0
2012-03-01 Multi-Stage Fracture 2277.90 2278.00 0
2012-03-01 Multi-Stage Fracture 2202.50 2202.60 0
2012-03-01 Multi-Stage Fracture 3307.30 3307.40 0
2012-03-01 Multi-Stage Fracture 3245.50 3245.60 0
2012-03-01 Multi-Stage Fracture 3156.60 3156.70 0
2012-03-01 Multi-Stage Fracture 3070.80 3070.90 0
2012-03-01 Multi-Stage Fracture 2980.90 2981.00 0
2012-03-01 Multi-Stage Fracture 2890.90 2891.00 0
2012-03-01 Multi-Stage Fracture 2804.00 2804.10 0
2012-03-01 Multi-Stage Fracture 2730.30 2730.40 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6610 0.0 0.0 0.0
2013 7785 0.0 0.0 0.0
2014 8337 0.0 0.0 0.0
2015 3264 0.0 0.0 0.0
2019 5765 0.0 0.0 0.0
2020 2136 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-24 No Incident Encountered 0.00 0.00

For data sources see[8]

References