If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0345041605020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.89743,"lon":-114.514677,"icon":""}]} |
| Location: 02/05-16-034-04W5/0 | |
| Location Alias: 02/05-16-34-04 W5M | |
| Location Alias 2: 02/05-16-034-04 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 034 | |
| Meridian: 5 | |
| Range: 04 | |
| Section: 16 | |
| County/Municipality: Mountain View County | |
| Well Name: NAL HZ CAROL 5-16-34-4 | |
| Operator Name: NAL Resources Limited | |
| License Number: 0487247 | |
| License Date: 2017-12-15 | |
| License Status: Issued | |
| Spud Date: 2018-02-22 | |
| Final Drill Date: 2018-03-06 | |
| Well Total Depth: 4036.00 m | |
| Surface Hole Latitude: 51.897430 | |
| Surface Hole Longitude: -114.514677 |
| Date | Event |
|---|---|
| 2017-12-15 | Obtained License |
| 2018-02-25 | Surface Casing Operation Performed |
| 2018-02-27 | Direction Drilling Operation Performed - Deviate |
| 2018-02-28 | Direction Drilling Operation Performed - Horizontal |
| 2018-03-06 | Finished Drilling |
| 2018-03-06 | Well Log Performed |
| 2018-03-06 | Well Mode changed to Drilled and Cased |
| 2018-03-07 | Production Casing Operation Performed |
| 2018-03-07 | Rig Released |
| 2018-06-29 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-06-30 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-07-01 | Well Began Production |
| 2018-07-01 | Well Fluid changed to Crude Oil |
| 2018-07-01 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2018-02-22 | Horizon Drilling Inc. | 2 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2018-02-27 | 1798.90 | Deviate (5 - 79 degrees) |
| 2018-02-28 | 2136.90 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2018-06-29 | Multi-Stage Fracture | 3985.50 | 3987.40 | 0 |
| 2018-06-29 | Multi-Stage Fracture | 3585.40 | 3587.30 | 0 |
| 2018-06-29 | Multi-Stage Fracture | 3540.40 | 3542.30 | 0 |
| 2018-06-29 | Multi-Stage Fracture | 3495.20 | 3497.10 | 0 |
| 2018-06-29 | Multi-Stage Fracture | 3453.10 | 3454.90 | 0 |
| 2018-06-29 | Multi-Stage Fracture | 3407.70 | 3409.60 | 0 |
| 2018-06-29 | Multi-Stage Fracture | 3362.90 | 3364.90 | 0 |
| 2018-06-29 | Multi-Stage Fracture | 3318.50 | 3320.40 | 0 |
| 2018-06-29 | Multi-Stage Fracture | 3273.20 | 3275.10 | 0 |
| 2018-06-29 | Multi-Stage Fracture | 3228.50 | 3230.50 | 0 |
| 2018-06-29 | Multi-Stage Fracture | 3185.40 | 3187.30 | 0 |
| 2018-06-29 | Multi-Stage Fracture | 3940.60 | 3942.50 | 0 |
| 2018-06-29 | Multi-Stage Fracture | 3141.60 | 3143.50 | 0 |
| 2018-06-30 | Multi-Stage Fracture | 3096.90 | 3098.90 | 0 |
| 2018-06-30 | Multi-Stage Fracture | 3052.70 | 3054.60 | 0 |
| 2018-06-30 | Multi-Stage Fracture | 3007.30 | 3009.20 | 0 |
| 2018-06-30 | Multi-Stage Fracture | 2961.90 | 2963.90 | 0 |
| 2018-06-30 | Multi-Stage Fracture | 2917.40 | 2919.30 | 0 |
| 2018-06-30 | Multi-Stage Fracture | 2872.30 | 2874.30 | 0 |
| 2018-06-30 | Multi-Stage Fracture | 2827.30 | 2829.20 | 0 |
| 2018-06-30 | Multi-Stage Fracture | 2783.20 | 2785.20 | 0 |
| 2018-06-30 | Multi-Stage Fracture | 2738.90 | 2740.90 | 0 |
| 2018-06-29 | Multi-Stage Fracture | 3895.20 | 3897.10 | 0 |
| 2018-06-30 | Multi-Stage Fracture | 2693.90 | 2695.80 | 0 |
| 2018-06-30 | Multi-Stage Fracture | 2648.90 | 2650.90 | 0 |
| 2018-06-30 | Multi-Stage Fracture | 2604.20 | 2606.10 | 0 |
| 2018-06-30 | Multi-Stage Fracture | 2558.90 | 2560.90 | 0 |
| 2018-06-30 | Multi-Stage Fracture | 2514.10 | 2516.00 | 0 |
| 2018-06-30 | Multi-Stage Fracture | 2468.90 | 2470.80 | 0 |
| 2018-06-30 | Multi-Stage Fracture | 2424.90 | 2426.80 | 0 |
| 2018-06-30 | Multi-Stage Fracture | 2379.90 | 2381.80 | 0 |
| 2018-06-30 | Multi-Stage Fracture | 2334.30 | 2336.20 | 0 |
| 2018-06-30 | Multi-Stage Fracture | 2291.30 | 2293.20 | 0 |
| 2018-06-29 | Multi-Stage Fracture | 3849.90 | 3851.80 | 0 |
| 2018-06-30 | Multi-Stage Fracture | 2246.20 | 2248.10 | 0 |
| 2018-06-30 | Multi-Stage Fracture | 2201.30 | 2203.20 | 0 |
| 2018-06-30 | Multi-Stage Fracture | 2156.80 | 2158.70 | 0 |
| 2018-06-29 | Multi-Stage Fracture | 3804.40 | 3806.40 | 0 |
| 2018-06-29 | Multi-Stage Fracture | 3759.20 | 3761.20 | 0 |
| 2018-06-29 | Multi-Stage Fracture | 3714.30 | 3716.20 | 0 |
| 2018-06-29 | Multi-Stage Fracture | 3670.60 | 3672.50 | 0 |
| 2018-06-29 | Multi-Stage Fracture | 3628.50 | 3630.50 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2018-06-29 | 2018-06-30 | 2,037 | 3,367 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | water | Not Available | 100 | 84.5762 | N/A | |||
| Sand 30/50 | Trican | silica crystalline | 14808-60-7 | 100 | 15.9091 | N/A | ||
| AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.011 | N/A | |
| dibromoacetonitrile | 3252-43-5 | 100 | 0.011 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.011 | N/A | ||||
| polyethylene glycol | 25322-68-3 | 100 | 0.011 | N/A | ||||
| sodium bromide | 7647-15-6 | 100 | 0.011 | N/A | ||||
| CC-8 | Trican | Clay Control | choline chloride | 67-48-1 | 100 | 0.1734 | N/A | |
| non-hazardous ingredients | Not Available | 100 | 0.1734 | N/A | ||||
| FR-22 | Trican | Friction Reducer | alcohols. C10-16. ethoxylated | 68002-97-1 | 100 | 0.0466 | N/A | |
| distillates (petroleum). hydrotreated light naphthenic | 64742-53-6 | 100 | 0.0466 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0466 | N/A | ||||
| S-17X | Trican | Surfactant | 1-hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0409 | N/A | |
| benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol | 26836-07-7 | 100 | 0.0409 | N/A | ||||
| methanol | 67-56-1 | 100 | 0.0409 | N/A | ||||
| methyloxirane polymer with oxirane | 11/6/9003 | 100 | 0.0409 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0409 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2018-06-19 | 2018-06-22 | Surface Water - Runoff | 3567 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2018 | 3589 | 0.0 | 0.0 | 0.0 |
| 2019 | 8344 | 0.0 | 0.0 | 0.0 |
| 2020 | 2171 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2018-03-08 | No Incident Encountered | 0.00 | 0.00 |
| 2018-07-12 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]