If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0354020513020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.967892,"lon":-110.262265,"icon":""}]} |
| Location: 02/13-05-035-02W4/0 | |
| Location Alias: 02/13-05-35-02 W4M | |
| Location Alias 2: 02/13-05-035-02 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 035 | |
| Meridian: 4 | |
| Range: 02 | |
| Section: 05 | |
| County/Municipality: Special Areas No. 4 | |
| Well Name: KARVE 102 HZ PROVOST 13-5-35-2 | |
| Operator Name: Karve Energy Inc. | |
| License Number: 0496389 | |
| License Date: 2019-11-14 | |
| License Status: Issued | |
| Spud Date: 2020-01-20 | |
| Final Drill Date: 2020-01-23 | |
| Well Total Depth: 2245.00 m | |
| Surface Hole Latitude: 51.967892 | |
| Surface Hole Longitude: -110.262265 |
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2020-01-20 | Ensign Drilling Inc. | 348 | Drill To LD |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2020-01-21 | 453.10 | Deviate (5 - 79 degrees) |
| 2020-01-22 | 916.20 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2020-02-07 | Multi-Stage Fracture | 2175.40 | 2175.50 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 1891.50 | 1891.60 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 1850.60 | 1850.70 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 1823.00 | 1823.10 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 1782.10 | 1782.20 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 1754.70 | 1754.80 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 1714.60 | 1714.70 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 1687.30 | 1687.40 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 1659.70 | 1659.80 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 1633.20 | 1633.30 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 1567.00 | 1567.10 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 2147.90 | 2148.00 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 1526.10 | 1526.20 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 1485.40 | 1485.50 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 1458.10 | 1458.20 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 1430.80 | 1430.90 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 1389.90 | 1390.00 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 1362.40 | 1362.50 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 1334.90 | 1335.00 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 1307.40 | 1307.50 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 1279.90 | 1280.00 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 1252.40 | 1252.50 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 2120.40 | 2120.50 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 1224.90 | 1225.00 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 1197.40 | 1197.50 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 1169.90 | 1170.00 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 1142.30 | 1142.40 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 1047.90 | 1048.00 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 2092.80 | 2092.90 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 2065.20 | 2065.30 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 2024.30 | 2024.40 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 1984.90 | 1985.00 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 1945.40 | 1945.50 | 0 |
| 2020-02-07 | Multi-Stage Fracture | 1918.90 | 1919.00 | 0 |
For data sources see[5]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2020-02-07 | 2020-02-07 | 769 | 1,080 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | 7732-18-5 | 100 | 70.2568 | N/A | |||
| 16/30 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 22.3759 | N/A | ||
| 20/40 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 6.7132 | N/A | ||
| Secure BIO-10B (Biocide) | Step Energy Services | Bactericide/Biocide | 2-bromo-2-nitro.3-diol | 52-51-7 | 100 | 0.0074 | N/A | |
| Methyl Alcohol | 67-56-1 | 100 | 0.0074 | N/A | ||||
| SBE-2 (Breaker) | Step Energy Services | Breaker | Non-Hazardous Ingredients | Not Available | 100 | 0.0672 | N/A | |
| Sodium chloride | 7647-14-5 | 100 | 0.0672 | N/A | ||||
| SCS-1 (Clay Control) | Step Energy Services | Clay Control | Choline chloride | 67-48-1 | 100 | 0.0962 | N/A | |
| Non-Hazardous Ingredients | Not Available | 100 | 0.0962 | N/A | ||||
| SBX-2C (Crosslinker) | STEP Energy Services | Crosslinker | Boric Acid | 10043-35-3 | 100 | 0.0361 | N/A | |
| Ethylene Glycol | 107-21-1 | 100 | 0.0361 | N/A | ||||
| Monoethanolamine | 141-43-5 | 100 | 0.0361 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0361 | N/A | ||||
| SFR-110 (Friction Reducer) | Step Energy Services | Friction Reducer | Mineral Oil | 8012-95-1 | 100 | 0.0471 | N/A | |
| Polyacrylamide | 5/8/9003 | 100 | 0.0471 | N/A | ||||
| Primary Alcohol Ethoxylatehigh | 68131-39-5 | 100 | 0.0471 | N/A | ||||
| Sodium 2-Acryloylamino-2-methyl-1-propanesulfonic | 15214-89-8 | 100 | 0.0471 | N/A | ||||
| Sodium Acrylate | 7446-81-3 | 100 | 0.0471 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0471 | N/A | ||||
| SWG-101L (Gellant) | Step Energy Services | Gelling Agent | Guar gum | 9000-30-0 | 100 | 0.3327 | N/A | |
| Petroleum distillates. hydrotreated light | 64742-47-8 | 100 | 0.3327 | N/A | ||||
| SNE-2C (Non-Emulsifier) | STEP Energy Services | Surfactant | 2-Ethylhexanol distillation residue | 68609-68-7 | 100 | 0.0668 | N/A | |
| Dodecylbenzene Sulfonic Acid | 27176-87-0 | 100 | 0.0668 | N/A | ||||
| Methanol | 67-56-1 | 100 | 0.0668 | N/A | ||||
| Oxirane. methyl-. polymer | 11/6/9003 | 100 | 0.0668 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0668 | N/A |
For data sources see[6]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2020-01-28 | 2020-01-28 | Municipal Water | 150 |
| 2020-01-28 | 2020-01-28 | Municipal Water | 350 |
| 2020-01-28 | 2020-01-28 | Central Water Distribution Facility | 85 |
| 2020-01-28 | 2020-01-28 | Central Water Distribution Facility | 10 |
| 2020-01-28 | 2020-01-28 | Central Water Distribution Facility | 9 |
| 2020-01-28 | 2020-01-28 | Central Water Distribution Facility | 238 |
| 2020-01-28 | 2020-01-28 | Central Water Distribution Facility | 238 |
For data sources see[7]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2020 | 1121 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2020-01-24 | No Incident Encountered | 0.00 | 0.00 |
| 2020-02-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]