If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354021008020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.980059,"lon":-110.201887,"icon":""}]} |
Location: 02/08-10-035-02W4/0 | |
Location Alias: 02/08-10-35-02 W4M | |
Location Alias 2: 02/08-10-035-02 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 02 | |
Section: 10 | |
County/Municipality: Special Areas No. 4 | |
Well Name: RHE 102 PROVOST 8-10-35-2 | |
Operator Name: Rolling Hills Energy Ltd. | |
License Number: 0482435 | |
License Date: 2017-01-17 | |
License Status: Issued | |
Spud Date: 2017-01-24 | |
Final Drill Date: 2017-02-02 | |
Well Total Depth: 1796.00 m | |
Surface Hole Latitude: 51.980059 | |
Surface Hole Longitude: -110.201887 |
Date | Event |
---|---|
2017-01-17 | Obtained License |
2017-01-28 | Surface Casing Operation Performed |
2017-01-31 | Direction Drilling Operation Performed - Deviate |
2017-02-01 | Direction Drilling Operation Performed - Horizontal |
2017-02-02 | Finished Drilling |
2017-02-02 | Well Log Performed |
2017-02-02 | Well Mode changed to Drilled and Cased |
2017-02-03 | Production Casing Operation Performed |
2017-02-03 | Rig Released |
2017-02-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-02-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-02-23 | Well Began Production |
2017-02-23 | Well Fluid changed to Crude Oil |
2017-02-23 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-01-24 | Predator Drilling Inc. | 9 | N/A | Set Surface |
2017-01-31 | Precision Drilling Corporation | 292 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-01-31 | 445.12 | Deviate (5 - 79 degrees) |
2017-02-01 | 881.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-02-17 | Multi-Stage Fracture | 1757.40 | 1759.30 | 0 |
2017-02-17 | Multi-Stage Fracture | 1505.50 | 1507.40 | 0 |
2017-02-17 | Multi-Stage Fracture | 1479.00 | 1480.80 | 0 |
2017-02-17 | Multi-Stage Fracture | 1383.50 | 1385.30 | 0 |
2017-02-17 | Multi-Stage Fracture | 1356.50 | 1358.30 | 0 |
2017-02-17 | Multi-Stage Fracture | 1318.60 | 1320.40 | 0 |
2017-02-17 | Multi-Stage Fracture | 1291.70 | 1293.60 | 0 |
2017-02-17 | Multi-Stage Fracture | 1264.80 | 1266.70 | 0 |
2017-02-17 | Multi-Stage Fracture | 1226.50 | 1228.40 | 0 |
2017-02-17 | Multi-Stage Fracture | 1199.50 | 1201.30 | 0 |
2017-02-17 | Multi-Stage Fracture | 1172.50 | 1174.30 | 0 |
2017-02-17 | Multi-Stage Fracture | 1730.70 | 1732.60 | 0 |
2017-02-17 | Multi-Stage Fracture | 1110.40 | 1112.30 | 0 |
2017-02-17 | Multi-Stage Fracture | 1083.40 | 1085.30 | 0 |
2017-02-17 | Multi-Stage Fracture | 1056.10 | 1058.00 | 0 |
2017-02-17 | Multi-Stage Fracture | 1017.30 | 1019.10 | 0 |
2017-02-17 | Multi-Stage Fracture | 990.00 | 991.80 | 0 |
2017-02-17 | Multi-Stage Fracture | 939.60 | 941.50 | 0 |
2017-02-18 | Multi-Stage Fracture | 912.20 | 914.00 | 0 |
2017-02-18 | Multi-Stage Fracture | 884.90 | 886.80 | 0 |
2017-02-17 | Multi-Stage Fracture | 1703.80 | 1705.70 | 0 |
2017-02-17 | Multi-Stage Fracture | 1677.10 | 1678.90 | 0 |
2017-02-17 | Multi-Stage Fracture | 1650.50 | 1652.40 | 0 |
2017-02-17 | Multi-Stage Fracture | 1612.10 | 1614.00 | 0 |
2017-02-17 | Multi-Stage Fracture | 1585.70 | 1587.50 | 0 |
2017-02-17 | Multi-Stage Fracture | 1559.10 | 1561.00 | 0 |
2017-02-17 | Multi-Stage Fracture | 1532.10 | 1534.00 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-02-17 | 2017-02-18 | 758 | 1,054 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | 7732-18-5 | 100 | 70.3538 | N/A | |||
Frac Sand - Regular | Iron Horse Energy Services | Crystalline Silica | 14808-60-7 | 100 | 14.5291 | N/A | ||
IH-BEZ-6 | Fusion Technologies Inc. | Breaker | Ethylene glycol | 107-21-1 | 100 | 0.0432 | N/A | |
IH-BEZ-6D | Fusion Technologies Inc. | Breaker | water | 7732-18-5 | 100 | 0.0122 | N/A | |
IH-CBX-5 | Fusion Technologies Inc. | Crosslinker | Boric Acid | 10043-35-3 | 100 | 0.1514 | N/A | |
Ethylene glycol | 107-21-1 | 100 | 0.1514 | N/A | ||||
Potassium Carbonate | 584-08-7 | 100 | 0.1514 | N/A | ||||
Potassium Hydroxide | 1310-58-3 | 100 | 0.1514 | N/A | ||||
IH-GA-1 | Fusion Technologies Inc. | Gelling Agent | Low toxicity mineral oil | 8042-47-5 | 100 | 0.3216 | N/A | |
IH-NE-7 | Fusion Technologies Inc. | Surfactant | 2-ethyhexanol | 104-76-7 | 100 | 0.0611 | N/A | |
EO-C7-9-iso. C8-rich alcohols | 78330-19-5 | 100 | 0.0611 | N/A | ||||
EO-C9-11-iso. C10-rich alcohols | 78330-20-8 | 100 | 0.0611 | N/A | ||||
Heavy aromatic naptha | 64742-94-5 | 100 | 0.0611 | N/A | ||||
Isopropanol | 67-63-0 | 100 | 0.0611 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0611 | N/A | ||||
Polyethylene glycol | 25322-68-3 | 100 | 0.0611 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-02-09 | 2017-02-11 | Surface Water - Runoff | 1223 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 7325 | 0.0 | 0.0 | 0.0 |
2018 | 6969 | 0.0 | 0.0 | 0.0 |
2019 | 6912 | 0.0 | 0.0 | 0.0 |
2020 | 2038 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-02-03 | No Incident Encountered | 0.00 | 0.00 |
2017-02-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]