If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354021112020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.993376,"lon":-110.169309,"icon":""}]} |
Location: 02/12-11-035-02W4/0 | |
Location Alias: 02/12-11-35-02 W4M | |
Location Alias 2: 02/12-11-035-02 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 02 | |
Section: 11 | |
County/Municipality: Special Areas No. 4 | |
Well Name: RHE 102 PROVOST 12-11-35-2 | |
Operator Name: Rolling Hills Energy Ltd. | |
License Number: 0494319 | |
License Date: 2019-04-29 | |
License Status: Issued | |
Spud Date: 2019-05-14 | |
Final Drill Date: 2019-06-01 | |
Well Total Depth: 2371.00 m | |
Surface Hole Latitude: 51.993376 | |
Surface Hole Longitude: -110.169309 |
Date | Event |
---|---|
2019-04-29 | Obtained License |
2019-05-13 | Set Surface |
2019-05-14 | Set Surface |
2019-05-15 | Surface Casing Operation Performed |
2019-05-30 | Drill To LD |
2019-05-31 | Direction Drilling Operation Performed - Deviate |
2019-05-31 | Direction Drilling Operation Performed - Horizontal |
2019-06-01 | Finished Drilling |
2019-06-01 | Production Casing Operation Performed |
2019-06-01 | Well Log Performed |
2019-06-01 | Well Mode changed to Drilled and Cased |
2019-06-02 | Rig Released |
2019-07-03 | Well Log Performed |
2019-07-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-07-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-07-15 | Well Began Production |
2019-07-15 | Well Fluid changed to Crude Oil |
2019-07-15 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-05-13 | Predator Drilling Inc. | 27 | Set Surface | |
2019-05-14 | Predator Drilling Inc. | 27 | Set Surface | |
2019-05-30 | Precision Drilling Corporation | 292 | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2019-05-31 | 479.60 | Deviate (5 - 79 degrees) |
2019-05-31 | 851.10 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-07-07 | Multi-Stage Fracture | 2318.00 | 2318.10 | 0 |
2019-07-07 | Multi-Stage Fracture | 2000.70 | 2000.80 | 0 |
2019-07-07 | Multi-Stage Fracture | 1976.70 | 1976.80 | 0 |
2019-07-07 | Multi-Stage Fracture | 1940.10 | 1940.20 | 0 |
2019-07-07 | Multi-Stage Fracture | 1904.90 | 1905.00 | 0 |
2019-07-07 | Multi-Stage Fracture | 1878.10 | 1878.20 | 0 |
2019-07-07 | Multi-Stage Fracture | 1836.10 | 1836.20 | 0 |
2019-07-07 | Multi-Stage Fracture | 1799.80 | 1799.90 | 0 |
2019-07-07 | Multi-Stage Fracture | 1774.00 | 1774.10 | 0 |
2019-07-07 | Multi-Stage Fracture | 1733.40 | 1733.50 | 0 |
2019-07-07 | Multi-Stage Fracture | 1698.40 | 1698.50 | 0 |
2019-07-07 | Multi-Stage Fracture | 2291.60 | 2291.70 | 0 |
2019-07-07 | Multi-Stage Fracture | 1661.10 | 1661.20 | 0 |
2019-07-07 | Multi-Stage Fracture | 1593.20 | 1593.30 | 0 |
2019-07-07 | Multi-Stage Fracture | 1567.20 | 1567.30 | 0 |
2019-07-07 | Multi-Stage Fracture | 1537.70 | 1537.80 | 0 |
2019-07-07 | Multi-Stage Fracture | 1516.30 | 1516.40 | 0 |
2019-07-07 | Multi-Stage Fracture | 1481.50 | 1481.60 | 0 |
2019-07-07 | Multi-Stage Fracture | 1461.10 | 1461.20 | 0 |
2019-07-07 | Multi-Stage Fracture | 1419.90 | 1420.00 | 0 |
2019-07-07 | Multi-Stage Fracture | 1382.60 | 1382.70 | 0 |
2019-07-07 | Multi-Stage Fracture | 1332.40 | 1332.50 | 0 |
2019-07-07 | Multi-Stage Fracture | 2240.30 | 2240.40 | 0 |
2019-07-07 | Multi-Stage Fracture | 1307.10 | 1307.20 | 0 |
2019-07-07 | Multi-Stage Fracture | 1266.90 | 1267.00 | 0 |
2019-07-07 | Multi-Stage Fracture | 1227.50 | 1227.60 | 0 |
2019-07-07 | Multi-Stage Fracture | 1189.80 | 1189.90 | 0 |
2019-07-07 | Multi-Stage Fracture | 1140.00 | 1140.10 | 0 |
2019-07-07 | Multi-Stage Fracture | 1114.60 | 1114.70 | 0 |
2019-07-07 | Multi-Stage Fracture | 1076.20 | 1076.30 | 0 |
2019-07-07 | Multi-Stage Fracture | 1037.80 | 1037.90 | 0 |
2019-07-07 | Multi-Stage Fracture | 1012.10 | 1012.20 | 0 |
2019-07-07 | Multi-Stage Fracture | 975.60 | 975.70 | 0 |
2019-07-07 | Multi-Stage Fracture | 2201.60 | 2201.70 | 0 |
2019-07-07 | Multi-Stage Fracture | 938.00 | 938.10 | 0 |
2019-07-08 | Multi-Stage Fracture | 911.90 | 912.00 | 0 |
2019-07-08 | Multi-Stage Fracture | 885.30 | 885.40 | 0 |
2019-07-07 | Multi-Stage Fracture | 2175.70 | 2175.80 | 0 |
2019-07-07 | Multi-Stage Fracture | 2140.60 | 2140.70 | 0 |
2019-07-07 | Multi-Stage Fracture | 2104.80 | 2104.90 | 0 |
2019-07-07 | Multi-Stage Fracture | 2077.80 | 2077.90 | 0 |
2019-07-07 | Multi-Stage Fracture | 2039.60 | 2039.70 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-07-07 | 2019-07-08 | 740 | 1,734 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | 7732-18-5 | 100 | 72.009 | N/A | |||
Frac Sand - Regular | Iron Horse Energy Services | Crystalline Silica | 14808-60-7 | 100 | 13.8544 | N/A | ||
Tolcide PS75LT | Fusion Technologies Inc. | Bactericide/Biocide | Tetrakis(Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0454 | N/A | |
water | 7732-18-5 | 100 | 0.0454 | N/A | ||||
IH-BEZ-6D | Fusion Technologies Inc. | Breaker | Ethylene glycol | 107-21-1 | 100 | 0.0279 | N/A | |
IH-CBX-5 | Fusion Technologies Inc. | Crosslinker | Boric Acid | 10043-35-3 | 100 | 0.151 | N/A | |
Ethylene glycol | 107-21-1 | 100 | 0.151 | N/A | ||||
Potassium Carbonate | 584-08-7 | 100 | 0.151 | N/A | ||||
Potassium Hydroxide | 1310-58-3 | 100 | 0.151 | N/A | ||||
IH-GA-1 | Fusion Technologies Inc. | Gelling Agent | Low toxicity mineral oil | 8042-47-5 | 100 | 0.3292 | N/A | |
IH-NE-7 | Fusion Technologies Inc. | Surfactant | Methanol | 67-56-1 | 100 | 0.0579 | N/A | |
Trimethylopropane ethoxylated | 52624-57-4 | 100 | 0.0579 | N/A | ||||
water | 7732-18-5 | 100 | 0.0579 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-07-03 | 2019-07-06 | Surface Water - Runoff | 1520 |
2019-07-03 | 2019-07-06 | Surface Water - Runoff | 388 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 4059 | 0.0 | 0.0 | 0.0 |
2020 | 2132 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-05-30 | No Incident Encountered | 0.00 | 0.00 |
2019-07-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]