X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354031804020

Well Details

Well ID: 0354031804020
Loading map...
Location: 02/04-18-035-03W4/0
Location Alias: 02/04-18-35-03 W4M
Location Alias 2: 02/04-18-035-03 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 03
Section: 18
County/Municipality: Special Areas No. 4
Well Name: RHE 102 PROVOST 4-18-35-3
Operator Name: Rolling Hills Energy Ltd.
License Number: 0484064
License Date: 2017-06-15
License Status: Amended
Spud Date: 2017-06-28
Final Drill Date: 2018-01-12
Well Total Depth: 2371.00 m
Surface Hole Latitude: 51.997978
Surface Hole Longitude: -110.405865

For data sources see[1][2]

Well History

Date Event
2017-06-15 Obtained License
2017-06-28 Surface Casing Operation Performed
2017-06-28 Well Mode changed to Preset
2018-01-10 Direction Drilling Operation Performed - Deviate
2018-01-10 Direction Drilling Operation Performed - Horizontal
2018-01-11 Well Log Performed
2018-01-12 Finished Drilling
2018-01-12 Production Casing Operation Performed
2018-01-12 Well Mode changed to Drilled and Cased
2018-01-13 Rig Released
2018-01-23 Well Log Performed
2018-02-01 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-02 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-14 Well Began Production
2018-02-14 Well Fluid changed to Crude Oil
2018-02-14 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-01-10 Precision Drilling Corporation 292 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-01-10 377.30 Deviate (5 - 79 degrees)
2018-01-10 1023.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-02-01 Multi-Stage Fracture 2274.90 2275.00 0
2018-02-01 Multi-Stage Fracture 1979.10 1979.20 0
2018-02-01 Multi-Stage Fracture 1943.50 1943.60 0
2018-02-01 Multi-Stage Fracture 1919.40 1919.50 0
2018-02-01 Multi-Stage Fracture 1872.30 1872.40 0
2018-02-01 Multi-Stage Fracture 1836.80 1836.90 0
2018-02-01 Multi-Stage Fracture 1812.50 1812.60 0
2018-02-01 Multi-Stage Fracture 1776.80 1776.90 0
2018-02-02 Multi-Stage Fracture 1741.30 1741.40 0
2018-02-02 Multi-Stage Fracture 1694.00 1694.10 0
2018-02-02 Multi-Stage Fracture 1658.20 1658.30 0
2018-02-01 Multi-Stage Fracture 2239.20 2239.30 0
2018-02-02 Multi-Stage Fracture 1634.10 1634.20 0
2018-02-02 Multi-Stage Fracture 1609.80 1609.90 0
2018-02-02 Multi-Stage Fracture 1574.60 1574.70 0
2018-02-02 Multi-Stage Fracture 1538.90 1539.00 0
2018-02-02 Multi-Stage Fracture 1514.60 1514.70 0
2018-02-02 Multi-Stage Fracture 1479.40 1479.50 0
2018-02-02 Multi-Stage Fracture 1455.50 1455.60 0
2018-02-02 Multi-Stage Fracture 1431.30 1431.40 0
2018-02-02 Multi-Stage Fracture 1315.10 1315.20 0
2018-02-02 Multi-Stage Fracture 1290.90 1291.00 0
2018-02-01 Multi-Stage Fracture 2192.60 2192.70 0
2018-02-02 Multi-Stage Fracture 1266.60 1266.70 0
2018-02-02 Multi-Stage Fracture 1219.40 1219.50 0
2018-02-02 Multi-Stage Fracture 1195.40 1195.50 0
2018-02-02 Multi-Stage Fracture 1159.70 1159.80 0
2018-02-02 Multi-Stage Fracture 1135.40 1135.50 0
2018-02-02 Multi-Stage Fracture 1111.30 1111.40 0
2018-02-02 Multi-Stage Fracture 1064.20 1064.30 0
2018-02-02 Multi-Stage Fracture 1040.00 1040.10 0
2018-02-01 Multi-Stage Fracture 2169.00 2169.10 0
2018-02-01 Multi-Stage Fracture 2133.90 2134.00 0
2018-02-01 Multi-Stage Fracture 2087.20 2087.30 0
2018-02-01 Multi-Stage Fracture 2063.00 2063.10 0
2018-02-01 Multi-Stage Fracture 2027.30 2027.40 0
2018-02-01 Multi-Stage Fracture 2003.20 2003.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-02-01 2018-02-02 788 1,787 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 74.7979 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 12.2811 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0506 N/A
water 7732-18-5 100 0.0506 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.033 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1604 N/A
Ethylene glycol 107-21-1 100 0.1604 N/A
Potassium Carbonate 584-08-7 100 0.1604 N/A
Potassium Hydroxide 1310-58-3 100 0.1604 N/A
IH-FR-1C Fusion Technologies Inc. Friction Reducer Non-Whimis Regulated Not Available 100 0.0118 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.3205 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0633 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0633 N/A
water 7732-18-5 100 0.0633 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-01-25 2018-01-27 Surface Water - Runoff 1927

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 7193 0.0 0.0 0.0
2019 8599 0.0 0.0 0.0
2020 1882 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-06-28 No Incident Encountered 0.00 0.00
2018-01-13 No Incident Encountered 0.00 0.00
2018-02-13 No Incident Encountered 0.00 0.00

For data sources see[10]

References