If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0354043311000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.038774,"lon":-110.515848,"icon":""}]} |
| Location: 00/11-33-035-04W4/0 | |
| Location Alias: 00/11-33-35-04 W4M | |
| Location Alias 2: 00/11-33-035-04 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 035 | |
| Meridian: 4 | |
| Range: 04 | |
| Section: 33 | |
| County/Municipality: Special Areas No. 4 | |
| Well Name: HIGH GROUND HZ PROVOST 11-33-35-4 | |
| Operator Name: Karve Energy Inc. | |
| License Number: 0479642 | |
| License Date: 2016-06-09 | |
| License Status: Issued | |
| Spud Date: 2016-07-02 | |
| Final Drill Date: 2016-07-05 | |
| Well Total Depth: 1983.00 m | |
| Surface Hole Latitude: 52.038774 | |
| Surface Hole Longitude: -110.515848 |
| Date | Event |
|---|---|
| 2016-06-09 | Obtained License |
| 2016-07-03 | Direction Drilling Operation Performed - Deviate |
| 2016-07-03 | Surface Casing Operation Performed |
| 2016-07-04 | Direction Drilling Operation Performed - Horizontal |
| 2016-07-05 | Finished Drilling |
| 2016-07-05 | Well Log Performed |
| 2016-07-05 | Well Mode changed to Drilled and Cased |
| 2016-07-06 | Production Casing Operation Performed |
| 2016-07-06 | Rig Released |
| 2016-07-15 | Well Began Production |
| 2016-07-15 | Well Fluid changed to Crude Oil |
| 2016-07-15 | Well Mode changed to Flowing |
| 2016-07-25 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2016-07-26 | Well Log Performed |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2016-07-02 | Bonanza Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2016-07-03 | 453.50 | Deviate (5 - 79 degrees) |
| 2016-07-04 | 779.20 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2016-07-25 | Multi-Stage Fracture | 1952.50 | 1952.60 | 0 |
| 2016-07-25 | Multi-Stage Fracture | 1649.10 | 1649.20 | 0 |
| 2016-07-25 | Multi-Stage Fracture | 1605.00 | 1605.10 | 0 |
| 2016-07-25 | Multi-Stage Fracture | 1561.00 | 1561.10 | 0 |
| 2016-07-25 | Multi-Stage Fracture | 1516.90 | 1517.00 | 0 |
| 2016-07-25 | Multi-Stage Fracture | 1472.80 | 1472.90 | 0 |
| 2016-07-25 | Multi-Stage Fracture | 1428.70 | 1428.80 | 0 |
| 2016-07-25 | Multi-Stage Fracture | 1371.20 | 1371.30 | 0 |
| 2016-07-25 | Multi-Stage Fracture | 1313.70 | 1313.80 | 0 |
| 2016-07-25 | Multi-Stage Fracture | 1269.60 | 1269.70 | 0 |
| 2016-07-25 | Multi-Stage Fracture | 1225.50 | 1225.60 | 0 |
| 2016-07-25 | Multi-Stage Fracture | 1921.80 | 1921.90 | 0 |
| 2016-07-25 | Multi-Stage Fracture | 1181.40 | 1181.50 | 0 |
| 2016-07-25 | Multi-Stage Fracture | 1137.30 | 1137.40 | 0 |
| 2016-07-25 | Multi-Stage Fracture | 1093.20 | 1093.30 | 0 |
| 2016-07-25 | Multi-Stage Fracture | 1062.40 | 1062.50 | 0 |
| 2016-07-25 | Multi-Stage Fracture | 1031.60 | 1031.70 | 0 |
| 2016-07-25 | Multi-Stage Fracture | 1000.80 | 1000.90 | 0 |
| 2016-07-25 | Multi-Stage Fracture | 1891.00 | 1891.10 | 0 |
| 2016-07-25 | Multi-Stage Fracture | 1860.20 | 1860.30 | 0 |
| 2016-07-25 | Multi-Stage Fracture | 1829.60 | 1829.70 | 0 |
| 2016-07-25 | Multi-Stage Fracture | 1798.80 | 1798.90 | 0 |
| 2016-07-25 | Multi-Stage Fracture | 1768.00 | 1768.10 | 0 |
| 2016-07-25 | Multi-Stage Fracture | 1737.30 | 1737.40 | 0 |
| 2016-07-25 | Multi-Stage Fracture | 1693.20 | 1693.30 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2016-07-25 | 2016-07-25 | 703 | 0 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water - KCL ( 5%) | Not Available | 100 | 74.5584 | N/A | |||
| Sand (16/30) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 21.0252 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 21.0252 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 21.0253 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 21.0252 | N/A | ||||
| Sand (20/40) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 3.5042 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 3.5042 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 3.5042 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 3.5041 | N/A | ||||
| Tolcide PS75LT | Canyon Technical Services | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0105 | N/A | |
| Water | 7732-18-5 | 100 | 0.0105 | N/A | ||||
| CAN-2300 Breaker (Enzyme HpH) | Canyon Technical Services | Breaker | Cellulase Enzyme Solution | Not Available | 100 | 0.0159 | N/A | |
| CAN-2301 Breaker (Oxidizer) | Canyon Technical Services | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.0865 | N/A | |
| Non-hazardous base ingredient(s) | Not Available | 100 | 0.0865 | N/A | ||||
| CAN-2200 Crosslinker / pH buffer (Borate) | Canyon Technical Services | Crosslinker | Boric Acid | 10043-35-3 | 100 | 0.1526 | N/A | |
| Monoethanolamine | 141-43-5 | 100 | 0.1526 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.1526 | N/A | ||||
| CAN-2411 Non-emulsifier | Canyon Technical Services | Demulsifier | Ethylene glycol | 107-21-1 | 100 | 0.0715 | N/A | |
| Isopropanol | 67-63-0 | 100 | 0.0715 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0715 | N/A | ||||
| CAN-2000 Gellant (Guar) | Canyon Technical Services | Gelling Agent | Polysacharide Suspension | Not Available | 100 | 0.4534 | N/A | |
| paraFLO 2 | Canyon Technical Services | Scale Inhibitor | Non-hazardous base ingredient(s) | Not Available | 100 | 0.1211 | N/A | |
| Silica. crystalline-quartz | 14808-60-7 | 100 | 0.1212 | N/A | ||||
| White mineral oil | 8042-47-5 | 100 | 0.1211 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2016-07-25 | 2016-07-25 | Surface Water - Runoff | 885 |
| 2016-07-25 | 2016-07-25 | Surface Water - Runoff | 160 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2016 | 3053 | 0.0 | 0.0 | 0.0 |
| 2017 | 7360 | 0.0 | 0.0 | 0.0 |
| 2018 | 8327 | 0.0 | 0.0 | 0.0 |
| 2019 | 8570 | 0.0 | 0.0 | 0.0 |
| 2020 | 2088 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2016-07-06 | No Incident Encountered | 0.00 | 0.00 |
| 2016-07-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]