X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354051816020

Well Details

Well ID: 0354051816020
Loading map...
Location: 02/16-18-035-05W4/0
Location Alias: 02/16-18-35-05 W4M
Location Alias 2: 02/16-18-035-05 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 05
Section: 18
County/Municipality: Special Areas No. 4
Well Name: SPUR HZ PROVOST 16-18-35-5
Operator Name: Tamarack Acquisition Corp.
License Number: 0445861
License Date: 2012-05-14
License Status: Issued
Spud Date: 2012-06-12
Final Drill Date: 2012-06-17
Well Total Depth: 1590.00 m
Surface Hole Latitude: 52.004027
Surface Hole Longitude: -110.698717

For data sources see[1][2]

Well History

Date Event
2012-05-14 Obtained License
2012-06-13 Surface Casing Operation Performed
2012-06-14 Direction Drilling Operation Performed - Deviate
2012-06-16 Direction Drilling Operation Performed - Horizontal
2012-06-17 Finished Drilling
2012-06-17 Production Casing Operation Performed
2012-06-17 Well Log Performed
2012-06-17 Well Mode changed to Drilled and Cased
2012-06-18 Rig Released
2012-07-12 Well Log Performed
2012-07-15 Perforation Treatment Performed - Jet Perforation
2012-07-15 Well Log Performed
2012-07-29 Perforation Treatment Performed - Fractured
2012-08-21 Well Began Production
2012-08-21 Well Fluid changed to Crude Oil
2012-08-21 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-06-13 Savanna Drilling Corp. 431E N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-06-14 563.80 Deviate (5 - 79 degrees)
2012-06-16 874.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-07-15 Perforation 1552.00 1552.50 12
2012-07-15 Perforation 1393.50 1394.00 12
2012-07-15 Perforation 1343.00 1343.50 12
2012-07-15 Perforation 1299.00 1299.50 12
2012-07-15 Perforation 1249.00 1249.50 12
2012-07-15 Perforation 1203.00 1203.50 12
2012-07-15 Perforation 1155.00 1155.50 12
2012-07-29 Fracture 1552.00 1552.50 0
2012-07-29 Fracture 1518.00 1518.50 0
2012-07-29 Fracture 1474.00 1474.50 0
2012-07-29 Fracture 1424.00 1424.50 0
2012-07-15 Perforation 1518.00 1518.50 12
2012-07-29 Fracture 1380.00 1380.50 0
2012-07-29 Fracture 1565.50 1566.00 0
2012-07-29 Fracture 1531.50 1532.00 0
2012-07-29 Fracture 1487.50 1488.00 0
2012-07-29 Fracture 1437.50 1438.00 0
2012-07-29 Fracture 1393.50 1394.00 0
2012-07-29 Fracture 1343.00 1343.50 0
2012-07-29 Fracture 1299.00 1299.50 0
2012-07-29 Fracture 1249.00 1249.50 0
2012-07-29 Fracture 1203.00 1203.50 0
2012-07-15 Perforation 1474.00 1474.50 12
2012-07-29 Fracture 1155.00 1155.50 0
2012-07-15 Perforation 1424.00 1424.50 12
2012-07-15 Perforation 1380.00 1380.50 12
2012-07-15 Perforation 1565.50 1566.00 12
2012-07-15 Perforation 1531.50 1532.00 12
2012-07-15 Perforation 1487.50 1488.00 12
2012-07-15 Perforation 1437.50 1438.00 12

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 3159 0.0 0.0 0.0
2013 8387 0.0 0.0 0.0
2014 8308 0.0 0.0 0.0
2015 8590 0.0 0.0 0.0
2016 7417 0.0 0.0 0.0
2017 144 0.0 0.0 0.0
2018 688 0.0 0.0 0.0
2019 7513 0.0 0.0 0.0
2020 504 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-06-18 No Incident Encountered 0.00 0.00
2012-08-20 No Incident Encountered 0.00 0.00

For data sources see[8]

References