X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354061110000

Well Details

Well ID: 0354061110000
Loading map...
Location: 00/10-11-035-06W4/0
Location Alias: 00/10-11-35-06 W4M
Location Alias 2: 00/10-11-035-06 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 06
Section: 11
County/Municipality: Special Areas No. 4
Well Name: SPUR PROVOST 10-11-35-6
Operator Name: Tamarack Acquisition Corp.
License Number: 0016006
License Date: 1958-10-07
License Status: Suspension
Spud Date: 1958-10-07
Final Drill Date: 1958-10-12
Well Total Depth: 813.80 m
Surface Hole Latitude: 51.992357
Surface Hole Longitude: -110.751185

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-10-07 Obtained License
1958-10-12 Drill Stem Test Performed
1958-10-12 Finished Drilling
1958-10-12 Well Mode changed to Drilled and Cased
1958-10-13 Production Casing Operation Performed
1958-10-28 Perforation Treatment Performed - Bullet Perforation
1958-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-11-17 Well Began Production
1958-11-17 Well Fluid changed to Crude Oil
1958-11-17 Well Mode changed to Flowing
1958-11-19 Perforation Treatment Performed - Jet Perforation
1958-11-26 Perforation Treatment Performed - Fractured
1988-09-09 Well Fluid changed to Crude Oil
1988-09-09 Well Mode changed to Pumping
1998-08-15 Well Fluid changed to Crude Oil
1998-08-15 Well Mode changed to Suspended
1998-11-18 Well Fluid changed to Crude Oil
1998-11-18 Well Mode changed to Pumping
2014-06-17 Well Fluid changed to Crude Oil
2014-06-17 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-10-28 Bullet Perforation 796.70 798.60 26
1958-10-29 Acid Treatment 796.70 798.60 0
1958-11-19 Perforation 794.00 796.10 13
1958-11-26 Fracture 794.00 796.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1390 0.0 0.0 0.0
1969 5579 0.0 0.0 0.0
1970 8539 0.0 0.0 0.0
1971 8492 0.0 0.0 0.0
1972 8741 0.0 0.0 0.0
1973 8718 0.0 0.0 0.0
1974 8689 0.0 0.0 0.0
1975 8682 0.0 0.0 0.0
1976 8676 0.0 0.0 0.0
1977 8638 0.0 0.0 0.0
1978 8607 0.0 0.0 0.0
1979 8700 0.0 0.0 0.0
1980 8196 0.0 0.0 0.0
1981 7485 0.0 0.0 0.0
1982 5609 0.0 0.0 0.0
1983 8396 0.0 0.0 0.0
1984 8640 0.0 0.0 0.0
1985 8378 0.0 0.0 0.0
1986 8542 0.0 0.0 0.0
1987 7946 0.0 0.0 0.0
1988 7830 0.0 0.0 0.0
1989 6268 0.0 0.0 0.0
1990 7230 0.0 0.0 0.0
1991 8422 0.0 0.0 0.0
1992 7855 0.0 0.0 0.0
1993 8659 0.0 0.0 0.0
1994 8731 0.0 0.0 0.0
1995 8330 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 6143 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8713 0.0 0.0 0.0
2001 8732 0.0 0.0 0.0
2002 8639 0.0 0.0 0.0
2003 7779 0.0 0.0 0.0
2004 8704 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8701 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 3336 0.0 0.0 0.0

For data sources see[5]

References