X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354061608A20

Well Details

Well ID: 0354061608A20
Loading map...
Location: A2/08-16-035-06W4/0
Location Alias: A2/08-16-35-06 W4M
Location Alias 2: A2/08-16-035-06 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 06
Section: 16
County/Municipality: Special Areas No. 4
Well Name: CLEO ENERGY PROVOST 8-16-35-6
Operator Name: Cleo Energy Corp.
License Number: 0193072
License Date: 1996-11-05
License Status: Abandoned
Spud Date: 1996-12-03
Final Drill Date: 1996-12-07
Well Total Depth: 1140.00 m
Surface Hole Latitude: 52.005411
Surface Hole Longitude: -110.793792

For data sources see[1][2]

Well History

Date Event
1996-11-05 Obtained License
1996-12-04 Direction Drilling Operation Performed - Deviate
1996-12-04 Surface Casing Operation Performed
1996-12-07 Finished Drilling
1996-12-07 Well Log Performed
1996-12-07 Well Mode changed to Drilled and Cased
1996-12-08 Production Casing Operation Performed
1996-12-08 Rig Released
1997-01-03 Perforation Treatment Performed - Jet Perforation
1997-01-04 Perforation Treatment Performed - Jet Perforation
1997-01-07 Well Began Production
1997-01-07 Well Fluid changed to Crude Oil
1997-01-07 Well Mode changed to Pumping
2010-11-18 Well Fluid changed to Crude Oil
2010-11-18 Well Mode changed to Suspended
2015-09-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-09-09 Plug Back Performed
2015-09-09 Well Fluid changed to Crude Oil
2015-09-09 Well Mode changed to Abandoned Zone
2017-02-20 Well Abandoned
2017-02-20 Well Fluid changed to Crude Oil
2017-02-20 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-12-04 232.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-01-03 Perforation 1073.50 1074.50 15
1997-01-03 Perforation 1071.00 1072.40 15
1997-01-04 Perforation 1067.00 1068.00 15
1997-01-04 Perforation 1062.00 1064.00 15
2015-09-09 Packing Device Capped w/Cement 1043.00 1054.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 8162 0.0 0.0 0.0
1998 8183 0.0 0.0 0.0
1999 8386 0.0 0.0 0.0
2000 8652 0.0 0.0 0.0
2001 8341 0.0 0.0 0.0
2002 8729 0.0 0.0 0.0
2003 5670 0.0 0.0 0.0
2004 1392 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-09-10 No Incident Encountered 0.00 0.00

For data sources see[7]

References