X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354061613D00

Well Details

Well ID: 0354061613D00
Loading map...
Location: D0/13-16-035-06W4/0
Location Alias: D0/13-16-35-06 W4M
Location Alias 2: D0/13-16-035-06 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 06
Section: 16
County/Municipality: Special Areas No. 4
Well Name: WISER ET AL D PROVOST 13-16-35-6
Operator Name: Lightstream Resources Ltd.
License Number: 0144030
License Date: 1990-04-27
License Status: RecCertified
Spud Date: 1990-05-22
Final Drill Date: 1990-05-25
Well Total Depth: 1018.00 m
Surface Hole Latitude: 52.011576
Surface Hole Longitude: -110.809719

For data sources see[1][2]

Well History

Date Event
1990-04-27 Obtained License
1990-05-23 Surface Casing Operation Performed
1990-05-25 Finished Drilling
1990-05-25 Well Log Performed
1990-05-25 Well Mode changed to Drilled and Cased
1990-05-26 Production Casing Operation Performed
1990-05-26 Rig Released
1990-06-10 Perforation Treatment Performed - Jet Perforation
1990-06-10 Well Log Performed
1990-06-17 Well Began Production
1990-06-17 Well Fluid changed to Crude Oil
1990-06-17 Well Mode changed to Pumping
1992-01-20 Perforation Treatment Performed - Fractured
1993-05-10 Perforation Treatment Performed - Jet Perforation
1993-10-19 Well Fluid changed to Crude Oil
1993-10-19 Well Mode changed to Suspended
1994-10-03 Well Log Performed
1994-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-10-04 Perforation Treatment Performed - Jet Perforation
1994-10-04 Perforation Treatment Performed - Remedial Casing
1994-10-04 Plug Back Performed
1994-10-04 Well Fluid changed to Crude Oil
1994-10-04 Well Mode changed to Abandoned
1994-10-05 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-06-10 Perforation 971.50 972.50 14
1990-06-10 Perforation 973.70 975.00 14
1992-01-20 Fracture 971.50 975.00 0
1993-05-10 Perforation 976.00 977.50 13
1994-10-04 Packing Device Capped w/Cement 957.00 965.00 0
1994-10-04 Perforation 291.00 292.00 13
1994-10-04 Remedial Casing Cementing 291.00 292.00 0
1994-10-04 Packing Device Capped w/Cement 276.50 306.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 4579 0.0 0.0 0.0
1991 8303 0.0 0.0 0.0
1992 7626 0.0 0.0 0.0
1993 3679 0.0 0.0 0.0

For data sources see[5]

References