X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354071010B00

Well Details

Well ID: 0354071010B00
Loading map...
Location: B0/10-10-035-07W4/0
Location Alias: B0/10-10-35-07 W4M
Location Alias 2: B0/10-10-035-07 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 07
Section: 10
County/Municipality: Special Areas No. 4
Well Name: SPUR 10B PROVOST 10-10-35-7
Operator Name: Tamarack Acquisition Corp.
License Number: 0158268
License Date: 1993-05-13
License Status: Suspension
Spud Date: 1993-06-09
Final Drill Date: 1993-06-14
Well Total Depth: 1166.60 m
Surface Hole Latitude: 51.990553
Surface Hole Longitude: -110.925454

For data sources see[1][2]

Well History

Date Event
1993-05-13 Obtained License
1993-06-10 Surface Casing Operation Performed
1993-06-11 Direction Drilling Operation Performed - Deviate
1993-06-11 Well Log Performed
1993-06-14 Finished Drilling
1993-06-14 Well Mode changed to Drilled and Cased
1993-06-15 Production Casing Operation Performed
1993-06-15 Well Log Performed
1993-06-16 Rig Released
1993-07-06 Well Log Performed
1993-07-12 Well Log Performed
1993-07-23 Perforation Treatment Performed - Jet Perforation
1993-07-23 Well Log Performed
1993-07-26 Perforation Treatment Performed - Fractured
1993-08-01 Well Began Production
1993-08-01 Well Fluid changed to Crude Oil
1993-08-01 Well Mode changed to Pumping
2009-05-01 Well Fluid changed to Crude Oil
2009-05-01 Well Mode changed to Suspended
2010-05-12 Well Log Performed
2010-06-04 Perforation Treatment Performed - Cement Squeeze
2010-06-04 Plug Back Performed
2010-06-04 Well Fluid changed to Crude Oil
2010-06-04 Well Mode changed to Abandoned Zone
2010-08-23 Perforation Treatment Performed - Jet Perforation
2010-08-23 Well Log Performed
2010-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-09-02 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-06-11 188.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-07-23 Perforation 1136.00 1137.00 17
1993-07-26 Fracture 1136.00 1137.00 0
2010-06-04 Cement Squeeze 1136.00 1137.00 0
2010-08-23 Perforation 1152.00 1157.00 20
2010-08-25 Acid Treatment 1152.00 1157.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 2860 0.0 0.0 0.0
1994 8203 0.0 0.0 0.0
1995 8720 0.0 0.0 0.0
1996 8603 0.0 0.0 0.0
1997 8341 0.0 0.0 0.0
1998 8695 0.0 0.0 0.0
1999 8745 0.0 0.0 0.0
2000 8755 0.0 0.0 0.0
2001 8685 0.0 0.0 0.0
2002 8681 0.0 0.0 0.0
2003 2443 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-12-11 No Incident Encountered 0.00 0.00

For data sources see[7]

References