X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354072002000

Well Details

Well ID: 0354072002000
Loading map...
Location: 00/02-20-035-07W4/0
Location Alias: 00/02-20-35-07 W4M
Location Alias 2: 00/02-20-035-07 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 07
Section: 20
County/Municipality: Special Areas No. 4
Well Name: SPUR PROVOST 2-20-35-7
Operator Name: Tamarack Acquisition Corp.
License Number: 0135539
License Date: 1988-08-12
License Status: Suspension
Spud Date: 1988-08-16
Final Drill Date: 1988-08-19
Well Total Depth: 1091.00 m
Surface Hole Latitude: 52.014369
Surface Hole Longitude: -110.966889

For data sources see[1][2]

Well History

Date Event
1988-08-12 Obtained License
1988-08-17 Surface Casing Operation Performed
1988-08-19 Finished Drilling
1988-08-19 Well Log Performed
1988-08-19 Well Mode changed to Drilled and Cased
1988-08-20 Drill Stem Test Performed
1988-08-21 Rig Released
1988-08-22 Production Casing Operation Performed
1988-08-28 Well Log Performed
1988-09-05 Perforation Treatment Performed - Jet Perforation
1988-09-06 Perforation Treatment Performed - Jet Perforation
1988-09-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-09-08 Plug Back Performed
1988-09-09 Perforation Treatment Performed - Jet Perforation
1988-09-11 Perforation Treatment Performed - Fractured
1988-10-17 Well Began Production
1988-10-17 Well Fluid changed to Crude Oil
1988-10-17 Well Mode changed to Flowing
1992-10-25 Well Fluid changed to Crude Oil
1992-10-25 Well Mode changed to Pumping
2016-06-30 Well Fluid changed to Crude Oil
2016-06-30 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-09-05 Perforation 1067.00 1070.00 13
1988-09-06 Perforation 1055.50 1057.00 13
1988-09-08 Packing Device Capped w/Cement 1057.00 1065.00 0
1988-09-08 Packing Device Capped w/Cement 1042.00 1050.00 0
1988-09-09 Perforation 864.00 866.00 13
1988-09-09 Perforation 868.00 870.00 13
1988-09-11 Fracture 864.00 870.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 644 0.0 0.0 0.0
1989 7167 0.0 0.0 0.0
1990 8469 0.0 0.0 0.0
1991 8700 0.0 0.0 0.0
1992 8661 0.0 0.0 0.0
1993 8501 0.0 0.0 0.0
1994 8551 0.0 0.0 0.0
1995 7696 0.0 0.0 0.0
1996 8746 0.0 0.0 0.0
1997 8667 0.0 0.0 0.0
1998 7738 0.0 0.0 0.0
1999 8610 0.0 0.0 0.0
2000 8526 0.0 0.0 0.0
2001 7607 0.0 0.0 0.0
2002 6467 0.0 0.0 0.0
2003 8557 0.0 0.0 0.0
2004 8766 0.0 0.0 0.0
2005 7761 0.0 0.0 0.0
2006 8351 0.0 0.0 0.0
2007 8196 0.0 0.0 0.0
2008 7623 0.0 0.0 0.0
2009 3672 0.0 0.0 0.0
2010 8159 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8735 0.0 0.0 0.0
2013 6059 0.0 0.0 0.0
2014 5520 0.0 0.0 0.0
2015 2279 0.0 0.0 0.0

For data sources see[5]

References