X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354080608000

Well Details

Well ID: 0354080608000
Loading map...
Location: 00/08-06-035-08W4/0
Location Alias: 00/08-06-35-08 W4M
Location Alias 2: 00/08-06-035-08 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 08
Section: 06
County/Municipality: Special Areas No. 4
Well Name: SPUR PROVOST 8-6-35-8
Operator Name: Tamarack Acquisition Corp.
License Number: 0135987
License Date: 1988-08-30
License Status: Suspension
Spud Date: 1988-09-02
Final Drill Date: 1988-09-05
Well Total Depth: 1116.00 m
Surface Hole Latitude: 51.974290
Surface Hole Longitude: -111.127820

For data sources see[1][2]

Well History

Date Event
1988-08-30 Obtained License
1988-09-04 Surface Casing Operation Performed
1988-09-05 Finished Drilling
1988-09-05 Well Log Performed
1988-09-05 Well Mode changed to Drilled and Cased
1988-09-06 Rig Released
1988-09-07 Production Casing Operation Performed
1988-10-03 Perforation Treatment Performed - Jet Perforation
1988-10-12 Perforation Treatment Performed - Fractured
1988-11-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-11-05 Perforation Treatment Performed - Jet Perforation
1988-11-05 Plug Back Performed
1988-11-08 Perforation Treatment Performed - Fractured
1988-12-22 Well Began Production
1988-12-22 Well Fluid changed to Crude Oil
1988-12-22 Well Mode changed to Pumping
2008-10-28 Perforation Treatment Performed - Jet Perforation
2008-10-28 Well Log Performed
2017-07-20 Well Fluid changed to Crude Oil
2017-07-20 Well Mode changed to Suspended
2020-01-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-01-21 Plug Back Performed
2020-01-21 Well Fluid changed to Crude Oil
2020-01-21 Well Mode changed to Abandoned Zone
2020-01-22 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-10-03 Perforation 943.50 946.00 13
2020-01-22 Perforation 375.50 393.00 17
2020-01-22 Perforation 401.50 411.50 17
1988-10-12 Fracture 943.50 946.00 0
1988-11-05 Packing Device Capped w/Cement 929.00 937.00 0
1988-11-05 Perforation 902.00 905.00 13
1988-11-08 Fracture 902.00 905.00 0
2008-10-28 Perforation 897.00 898.00 17
2008-10-28 Perforation 899.00 901.00 17
2008-10-28 Perforation 892.00 897.00 17
2020-01-21 Packing Device Capped w/Cement 877.00 885.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 225 0.0 0.0 0.0
1989 8168 0.0 0.0 0.0
1990 8420 0.0 0.0 0.0
1991 8544 0.0 0.0 0.0
1992 8272 0.0 0.0 0.0
1993 8396 0.0 0.0 0.0
1994 8193 0.0 0.0 0.0
1995 8229 0.0 0.0 0.0
1996 8006 0.0 0.0 0.0
1997 8023 0.0 0.0 0.0
1998 8290 0.0 0.0 0.0
1999 8587 0.0 0.0 0.0
2000 8753 0.0 0.0 0.0
2001 8728 0.0 0.0 0.0
2002 8679 0.0 0.0 0.0
2003 8389 0.0 0.0 0.0
2004 8344 0.0 0.0 0.0
2005 8391 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8615 0.0 0.0 0.0
2008 7455 0.0 0.0 0.0
2009 8377 0.0 0.0 0.0
2010 7895 0.0 0.0 0.0
2011 8103 0.0 0.0 0.0
2012 8549 0.0 0.0 0.0
2013 6837 0.0 0.0 0.0
2014 8203 0.0 0.0 0.0
2015 4809 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-01-23 No Incident Encountered 0.00 0.00

For data sources see[6]

References