X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354081311000

Well Details

Well ID: 0354081311000
Loading map...
Location: 00/11-13-035-08W4/0
Location Alias: 00/11-13-35-08 W4M
Location Alias 2: 00/11-13-035-08 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 08
Section: 13
County/Municipality: Special Areas No. 4
Well Name: CABRE PROVOST 11-13-35-8
Operator Name: Enerplus Corporation
License Number: 0176898
License Date: 1995-03-15
License Status: RecCertified
Spud Date: 1995-05-09
Final Drill Date: 1995-05-14
Well Total Depth: 1150.00 m
Surface Hole Latitude: 52.007184
Surface Hole Longitude: -111.021999

For data sources see[1][2]

Well History

Date Event
1995-03-15 Obtained License
1995-05-09 Surface Casing Operation Performed
1995-05-09 Well Log Performed
1995-05-11 Direction Drilling Operation Performed - Deviate
1995-05-14 Finished Drilling
1995-05-14 Well Log Performed
1995-05-14 Well Mode changed to Drilled and Cased
1995-05-15 Well Log Performed
1995-05-18 Production Casing Operation Performed
1995-05-19 Rig Released
1995-05-25 Well Log Performed
1995-05-26 Well Log Performed
1995-05-27 Perforation Treatment Performed - Jet Perforation
1995-06-01 Well Began Production
1995-06-01 Well Fluid changed to Crude Oil
1995-06-01 Well Mode changed to Pumping
1995-07-11 Perforation Treatment Performed - Fractured
1995-08-02 Well Fluid changed to Crude Oil
1995-08-02 Well Mode changed to Suspended
1997-01-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-01-14 Plug Back Performed
1997-01-14 Well Abandoned
1997-01-14 Well Fluid changed to Crude Oil
1997-01-14 Well Log Performed
1997-01-14 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-05-11 520.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-05-27 Perforation 1082.50 1085.50 10
1995-07-11 Fracture 1082.50 1085.50 0
1997-01-14 Packing Device Capped w/Cement 1071.00 1079.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 1346 0.0 0.0 0.0

For data sources see[6]

References