If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354090306000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.972797,"lon":-111.21308,"icon":""}]} |
Location: 00/06-03-035-09W4/0 | |
Location Alias: 00/06-03-35-09 W4M | |
Location Alias 2: 00/06-03-035-09 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 09 | |
Section: 03 | |
County/Municipality: Special Areas No. 4 | |
Well Name: ENERPLUS ET AL PROVOST 6-3-35-9 | |
Operator Name: Enerplus Corporation | |
License Number: 0037950 | |
License Date: 1970-03-11 | |
License Status: RecCertified | |
Spud Date: 1970-03-18 | |
Final Drill Date: 1970-03-20 | |
Well Total Depth: 924.20 m | |
Surface Hole Latitude: 51.972797 | |
Surface Hole Longitude: -111.213080 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1970-03-11 | Obtained License |
1970-03-20 | Finished Drilling |
1970-03-20 | Well Mode changed to Drilled and Cased |
1970-03-21 | Production Casing Operation Performed |
1970-07-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1970-07-06 | Perforation Treatment Performed - Fractured |
1970-07-06 | Perforation Treatment Performed - Jet Perforation |
1970-11-21 | Well Began Production |
1970-11-21 | Well Fluid changed to Crude Oil |
1970-11-21 | Well Mode changed to Pumping |
1980-10-20 | Well Fluid changed to Crude Oil |
1980-10-20 | Well Mode changed to Suspended |
1980-11-20 | Well Fluid changed to Crude Oil |
1980-11-20 | Well Mode changed to Suspended |
1991-06-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-06-25 | Plug Back Performed |
1991-06-25 | Well Fluid changed to Crude Oil |
1991-06-25 | Well Mode changed to Abandoned |
1991-09-05 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1970-07-06 | Perforation | 901.90 | 903.40 | 7 |
1970-07-06 | Acid Treatment | 901.90 | 903.40 | 0 |
1970-07-06 | Fracture | 901.90 | 903.40 | 0 |
1991-06-25 | Packing Device Capped w/Cement | 885.00 | 893.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1970 | 1667 | 0.0 | 0.0 | 0.0 |
1971 | 8741 | 0.0 | 0.0 | 0.0 |
1972 | 8703 | 0.0 | 0.0 | 0.0 |
1973 | 8568 | 0.0 | 0.0 | 0.0 |
1974 | 8559 | 0.0 | 0.0 | 0.0 |
1975 | 8267 | 0.0 | 0.0 | 0.0 |
1976 | 8196 | 0.0 | 0.0 | 0.0 |
1977 | 7726 | 0.0 | 0.0 | 0.0 |
1978 | 6354 | 0.0 | 0.0 | 0.0 |
1979 | 5145 | 0.0 | 0.0 | 0.0 |
1980 | 6240 | 0.0 | 0.0 | 0.0 |
1982 | 144 | 0.0 | 0.0 | 0.0 |
For data sources see[5]