If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0354090306000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.972797,"lon":-111.21308,"icon":""}]} |
| Location: 00/06-03-035-09W4/0 | |
| Location Alias: 00/06-03-35-09 W4M | |
| Location Alias 2: 00/06-03-035-09 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 035 | |
| Meridian: 4 | |
| Range: 09 | |
| Section: 03 | |
| County/Municipality: Special Areas No. 4 | |
| Well Name: ENERPLUS ET AL PROVOST 6-3-35-9 | |
| Operator Name: Enerplus Corporation | |
| License Number: 0037950 | |
| License Date: 1970-03-11 | |
| License Status: RecCertified | |
| Spud Date: 1970-03-18 | |
| Final Drill Date: 1970-03-20 | |
| Well Total Depth: 924.20 m | |
| Surface Hole Latitude: 51.972797 | |
| Surface Hole Longitude: -111.213080 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1970-03-11 | Obtained License |
| 1970-03-20 | Finished Drilling |
| 1970-03-20 | Well Mode changed to Drilled and Cased |
| 1970-03-21 | Production Casing Operation Performed |
| 1970-07-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1970-07-06 | Perforation Treatment Performed - Fractured |
| 1970-07-06 | Perforation Treatment Performed - Jet Perforation |
| 1970-11-21 | Well Began Production |
| 1970-11-21 | Well Fluid changed to Crude Oil |
| 1970-11-21 | Well Mode changed to Pumping |
| 1980-10-20 | Well Fluid changed to Crude Oil |
| 1980-10-20 | Well Mode changed to Suspended |
| 1980-11-20 | Well Fluid changed to Crude Oil |
| 1980-11-20 | Well Mode changed to Suspended |
| 1991-06-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1991-06-25 | Plug Back Performed |
| 1991-06-25 | Well Fluid changed to Crude Oil |
| 1991-06-25 | Well Mode changed to Abandoned |
| 1991-09-05 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1970-07-06 | Perforation | 901.90 | 903.40 | 7 |
| 1970-07-06 | Acid Treatment | 901.90 | 903.40 | 0 |
| 1970-07-06 | Fracture | 901.90 | 903.40 | 0 |
| 1991-06-25 | Packing Device Capped w/Cement | 885.00 | 893.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1970 | 1667 | 0.0 | 0.0 | 0.0 |
| 1971 | 8741 | 0.0 | 0.0 | 0.0 |
| 1972 | 8703 | 0.0 | 0.0 | 0.0 |
| 1973 | 8568 | 0.0 | 0.0 | 0.0 |
| 1974 | 8559 | 0.0 | 0.0 | 0.0 |
| 1975 | 8267 | 0.0 | 0.0 | 0.0 |
| 1976 | 8196 | 0.0 | 0.0 | 0.0 |
| 1977 | 7726 | 0.0 | 0.0 | 0.0 |
| 1978 | 6354 | 0.0 | 0.0 | 0.0 |
| 1979 | 5145 | 0.0 | 0.0 | 0.0 |
| 1980 | 6240 | 0.0 | 0.0 | 0.0 |
| 1982 | 144 | 0.0 | 0.0 | 0.0 |
For data sources see[5]