If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354091306000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.001201,"lon":-111.165491,"icon":""}]} |
Location: 00/06-13-035-09W4/0 | |
Location Alias: 00/06-13-35-09 W4M | |
Location Alias 2: 00/06-13-035-09 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 09 | |
Section: 13 | |
County/Municipality: Special Areas No. 4 | |
Well Name: ENERPLUS ET AL PROVOST 6-13-35-9 | |
Operator Name: Enerplus Corporation | |
License Number: 0036525 | |
License Date: 1969-07-11 | |
License Status: RecCertified | |
Spud Date: 1969-07-15 | |
Final Drill Date: 1969-07-18 | |
Well Total Depth: 928.10 m | |
Surface Hole Latitude: 52.001201 | |
Surface Hole Longitude: -111.165491 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1969-07-11 | Obtained License |
1969-07-18 | Finished Drilling |
1969-07-18 | Production Casing Operation Performed |
1969-07-30 | Perforation Treatment Performed - Jet Perforation |
1969-07-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1969-07-31 | Perforation Treatment Performed - Fractured |
1970-08-04 | Well Mode changed to Drilled and Cased |
1974-05-08 | Well Began Production |
1974-05-08 | Well Fluid changed to Gas |
1974-05-08 | Well Mode changed to Flowing |
1974-05-25 | Well Fluid changed to Crude Oil |
1974-05-25 | Well Mode changed to Pumping |
1986-02-10 | Well Fluid changed to Crude Oil |
1986-02-10 | Well Mode changed to Suspended |
1991-06-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-06-04 | Perforation Treatment Performed - Selective Jet Perforations |
1991-06-04 | Plug Back Performed |
1991-08-06 | Perforation Treatment Performed - Remedial Casing |
1991-08-06 | Well Fluid changed to Crude Oil |
1991-08-06 | Well Mode changed to Abandoned |
1991-09-05 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1969-07-30 | Perforation | 911.40 | 912.90 | 7 |
1969-07-31 | Acid Treatment | 911.40 | 912.90 | 0 |
1969-07-31 | Fracture | 911.40 | 912.90 | 0 |
1991-06-04 | Packing Device Capped w/Cement | 891.00 | 899.00 | 0 |
1991-06-04 | Selective Jet Perforations | 300.00 | 300.00 | 4 |
1991-08-06 | Remedial Casing Cementing | 300.00 | 300.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1974 | 4529 | 0.0 | 0.0 | 0.0 |
1975 | 7882 | 0.0 | 0.0 | 0.0 |
1976 | 8587 | 0.0 | 0.0 | 0.0 |
1977 | 8380 | 0.0 | 0.0 | 0.0 |
1978 | 8573 | 0.0 | 0.0 | 0.0 |
1979 | 8634 | 0.0 | 0.0 | 0.0 |
1980 | 8753 | 0.0 | 0.0 | 0.0 |
1981 | 8403 | 0.0 | 0.0 | 0.0 |
1982 | 8670 | 0.0 | 0.0 | 0.0 |
1983 | 8587 | 0.0 | 0.0 | 0.0 |
1984 | 8585 | 0.0 | 0.0 | 0.0 |
1985 | 8543 | 0.0 | 0.0 | 0.0 |
1986 | 984 | 0.0 | 0.0 | 0.0 |
For data sources see[5]