If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0354091405002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.004316,"lon":-111.192623,"icon":""}]} |
| Location: 00/05-14-035-09W4/2 | |
| Location Alias: 00/05-14-35-09 W4M | |
| Location Alias 2: 00/05-14-035-09 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 035 | |
| Meridian: 4 | |
| Range: 09 | |
| Section: 14 | |
| County/Municipality: Special Areas No. 4 | |
| Well Name: ACL PROVOST 5-14-35-9 | |
| Operator Name: Karve Energy Inc. | |
| License Number: 0166631 | |
| License Date: 1994-04-26 | |
| License Status: Suspension | |
| Spud Date: 1994-05-01 | |
| Final Drill Date: 1994-05-06 | |
| Well Total Depth: 906.10 m | |
| Surface Hole Latitude: 52.004316 | |
| Surface Hole Longitude: -111.192623 |
| Date | Event |
|---|---|
| 1994-04-26 | Obtained License |
| 1994-05-02 | Surface Casing Operation Performed |
| 1994-05-06 | Finished Drilling |
| 1994-05-06 | Well Mode changed to Drilled and Cased |
| 1994-05-07 | Production Casing Operation Performed |
| 1994-05-07 | Rig Released |
| 1994-06-19 | Well Log Performed |
| 1994-06-20 | Perforation Treatment Performed - Open-Hole Completion |
| 1994-06-20 | Well Log Performed |
| 2012-03-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2012-03-04 | Plug Back Performed |
| 2012-03-05 | Well Log Performed |
| 2012-03-07 | Perforation Treatment Performed - Jet Perforation |
| 2012-07-25 | Well Began Production |
| 2012-07-25 | Well Fluid changed to Water |
| 2012-07-25 | Well Type changed to Source |
| 2013-09-12 | Perforation Treatment Performed - Jet Perforation |
| 2013-09-12 | Well Log Performed |
| 2016-10-06 | Well Fluid changed to Water |
| 2016-10-06 | Well Mode changed to Suspended |
| 2016-10-06 | Well Type changed to Source |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1994-06-20 | Open Hole/Barefoot Completion | 879.50 | 906.10 | 0 |
| 2012-03-04 | Packing Device Capped w/Cement | 858.00 | 868.00 | 0 |
| 2012-03-07 | Perforation | 402.00 | 407.00 | 13 |
| 2013-09-12 | Perforation | 390.00 | 410.00 | 17 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 24 | 0.0 | 0.0 | 0.0 |
| 2013 | 2232 | 0.0 | 0.0 | 0.0 |
| 2014 | 4926 | 0.0 | 0.0 | 0.0 |
| 2015 | 480 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2013-09-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]