X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354091804000

Well Details

Well ID: 0354091804000
Loading map...
Location: 00/04-18-035-09W4/0
Location Alias: 00/04-18-35-09 W4M
Location Alias 2: 00/04-18-035-09 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 09
Section: 18
County/Municipality: County of Paintearth No. 18
Well Name: COLORADO HAMILTON LAKE 4-18-35-9
Operator Name: Colenco Petroleum Ltd.
License Number: 0019813
License Date: 1960-10-06
License Status: RecCertified
Spud Date: 1960-10-19
Final Drill Date: 1960-10-24
Well Total Depth: 911.40 m
Surface Hole Latitude: 51.999533
Surface Hole Longitude: -111.287310

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-10-06 Obtained License
1960-10-24 Finished Drilling
1960-10-24 Well Mode changed to Drilled and Cased
1960-10-25 Production Casing Operation Performed
1960-10-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-10-26 Perforation Treatment Performed - Bullet Perforation
1960-10-26 Perforation Treatment Performed - Fractured
1960-11-08 Well Began Production
1960-11-08 Well Fluid changed to Crude Oil
1960-11-08 Well Mode changed to Pumping
1961-09-01 Well Began Injection
1961-09-01 Well Fluid changed to Water
1961-09-01 Well Type changed to Injection
1970-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-03-31 Well Fluid changed to Water
1970-03-31 Well Mode changed to Suspended
1970-03-31 Well Type changed to Injection
1982-06-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-06-02 Well Abandoned
1982-06-02 Well Fluid changed to Water
1982-06-02 Well Mode changed to Abandoned
1982-06-02 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-10-26 Bullet Perforation 889.40 890.90 16
1960-10-26 Acid Treatment 889.40 890.90 0
1960-10-26 Fracture 889.40 890.90 0
1970-02-19 Acid Treatment 889.40 890.90 0
1982-06-02 Packing Device Capped w/Cement 866.00 874.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0

For data sources see[5]

References