X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354100810000

Well Details

Well ID: 0354100810000
Loading map...
Location: 00/10-08-035-10W4/0
Location Alias: 00/10-08-35-10 W4M
Location Alias 2: 00/10-08-035-10 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 10
Section: 08
County/Municipality: County of Paintearth No. 18
Well Name: APACHE HB HAMIL 10-8-35-10
Operator Name: Hamcor Resources Inc.
License Number: 0032103
License Date: 1967-05-15
License Status: RecCertified
Spud Date: 1967-05-20
Final Drill Date: 1967-05-24
Well Total Depth: 947.90 m
Surface Hole Latitude: 51.991998
Surface Hole Longitude: -111.394624

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-05-15 Obtained License
1967-05-24 Finished Drilling
1967-05-24 Well Mode changed to Drilled and Cased
1967-05-25 Drill Stem Test Performed
1967-05-26 Drill Stem Test Performed
1967-05-27 Production Casing Operation Performed
1967-07-13 Perforation Treatment Performed - Jet Perforation
1968-07-21 Well Began Production
1968-07-21 Well Fluid changed to Crude Oil
1968-07-21 Well Mode changed to Pumping
1981-12-16 Perforation Treatment Performed - Jet Perforation
1981-12-16 Well Fluid changed to Crude Oil
1981-12-16 Well Mode changed to Pumping
1982-08-05 Perforation Treatment Performed - Fractured
1982-08-17 Well Fluid changed to Crude Oil
1982-08-17 Well Mode changed to Suspended
1988-02-09 Well Fluid changed to Crude Oil
1988-02-09 Well Mode changed to Pumping
1991-06-01 Well Fluid changed to Crude Oil
1991-06-01 Well Mode changed to Pumping
1992-11-01 Well Fluid changed to Crude Oil
1992-11-01 Well Mode changed to Suspended
1995-08-23 Well Fluid changed to Crude Oil
1995-08-23 Well Mode changed to Closed
1995-09-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-09-11 Perforation Treatment Performed - Cement Squeeze
1995-09-11 Plug Back Performed
1995-09-12 Perforation Treatment Performed - Cement Plug
1995-09-12 Perforation Treatment Performed - Jet Perforation
1995-09-12 Well Fluid changed to Crude Oil
1995-09-12 Well Mode changed to Abandoned
1995-09-19 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-07-13 Perforation 898.60 899.80 13
1981-12-16 Perforation 941.80 944.20 13
1982-08-05 Fracture 941.80 944.20 0
1995-09-11 Cement Squeeze 898.60 899.80 0
1995-09-11 Packing Device Capped w/Cement 855.00 926.60 0
1995-09-12 Perforation 267.00 268.00 7
1995-09-12 Cement Plug 194.00 286.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 3275 0.0 0.0 0.0
1969 8488 0.0 0.0 0.0
1970 8587 0.0 0.0 0.0
1971 8015 0.0 0.0 0.0
1972 8760 0.0 0.0 0.0
1973 8687 0.0 0.0 0.0
1974 8172 0.0 0.0 0.0
1975 8275 0.0 0.0 0.0
1976 7926 0.0 0.0 0.0
1977 8357 0.0 0.0 0.0
1978 7951 0.0 0.0 0.0
1979 8343 0.0 0.0 0.0
1980 8555 0.0 0.0 0.0
1981 7539 0.0 0.0 0.0
1988 7549 0.0 0.0 0.0
1989 8485 0.0 0.0 0.0
1990 8098 0.0 0.0 0.0
1991 2924 0.0 0.0 0.0
1992 86 0.0 0.0 0.0

For data sources see[5]

References