X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354100904000

Well Details

Well ID: 0354100904000
Loading map...
Location: 00/04-09-035-10W4/0
Location Alias: 00/04-09-35-10 W4M
Location Alias 2: 00/04-09-035-10 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 10
Section: 09
County/Municipality: County of Paintearth No. 18
Well Name: APACHE HAMIL 4-9-35-10
Operator Name: Hamcor Resources Inc.
License Number: 0032138
License Date: 1967-05-23
License Status: RecCertified
Spud Date: 1967-05-31
Final Drill Date: 1967-06-02
Well Total Depth: 925.70 m
Surface Hole Latitude: 51.984796
Surface Hole Longitude: -111.382628

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-05-23 Obtained License
1967-06-02 Finished Drilling
1967-06-02 Well Mode changed to Drilled and Cased
1967-06-04 Drill Stem Test Performed
1967-06-04 Production Casing Operation Performed
1967-07-14 Perforation Treatment Performed - Jet Perforation
1968-02-26 Well Began Production
1968-02-26 Well Fluid changed to Crude Oil
1968-02-26 Well Mode changed to Flowing
1970-12-23 Perforation Treatment Performed - Fractured
1979-10-15 Well Fluid changed to Crude Oil
1979-10-15 Well Mode changed to Suspended
1980-09-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-09-22 Perforation Treatment Performed - Jet Perforation
1980-09-22 Well Fluid changed to Crude Oil
1980-09-22 Well Mode changed to Abandoned Zone
1980-09-26 Perforation Treatment Performed - Jet Perforation
1990-05-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-05-14 Plug Back Performed
1990-05-23 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-07-14 Perforation 892.80 894.00 13
1970-12-23 Fracture 892.80 894.00 0
1980-09-18 Packing Device Capped w/Cement 800.00 800.00 0
1980-09-22 Perforation 310.20 312.20 13
1980-09-26 Perforation 305.00 308.00 13
1990-05-14 Packing Device Capped w/Cement 292.00 300.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 336 0.0 0.0 0.0
1970 1058 0.0 0.0 0.0
1971 5467 0.0 0.0 0.0
1972 5756 0.0 0.0 0.0

For data sources see[5]

References