If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0354100910000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.992588,"lon":-111.371718,"icon":""}]} |
| Location: 00/10-09-035-10W4/0 | |
| Location Alias: 00/10-09-35-10 W4M | |
| Location Alias 2: 00/10-09-035-10 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 035 | |
| Meridian: 4 | |
| Range: 10 | |
| Section: 09 | |
| County/Municipality: County of Paintearth No. 18 | |
| Well Name: APACHE HAMIL 10-9-35-10 | |
| Operator Name: Koch Exploration Canada, Ltd. | |
| License Number: 0031412 | |
| License Date: 1966-12-05 | |
| License Status: RecCertified | |
| Spud Date: 1966-12-06 | |
| Final Drill Date: 1966-12-10 | |
| Well Total Depth: 913.20 m | |
| Surface Hole Latitude: 51.992588 | |
| Surface Hole Longitude: -111.371718 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1966-12-05 | Obtained License |
| 1966-12-10 | Finished Drilling |
| 1966-12-10 | Well Mode changed to Drilled and Cased |
| 1966-12-11 | Production Casing Operation Performed |
| 1967-07-14 | Perforation Treatment Performed - Jet Perforation |
| 1972-01-17 | Well Began Production |
| 1972-01-17 | Well Fluid changed to Crude Oil |
| 1972-01-17 | Well Mode changed to Flowing |
| 1977-11-15 | Well Fluid changed to Crude Oil |
| 1977-11-15 | Well Mode changed to Pumping |
| 1984-05-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1984-05-30 | Plug Back Performed |
| 1984-05-30 | Well Abandoned |
| 1984-05-30 | Well Fluid changed to Crude Oil |
| 1984-05-30 | Well Log Performed |
| 1984-05-30 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1967-07-14 | Perforation | 887.90 | 889.10 | 13 |
| 1984-05-30 | Packing Device Capped w/Cement | 878.00 | 885.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1970 | 48 | 0.0 | 0.0 | 0.0 |
| 1972 | 2479 | 0.0 | 0.0 | 0.0 |
| 1973 | 192 | 0.0 | 0.0 | 0.0 |
| 1974 | 804 | 0.0 | 0.0 | 0.0 |
| 1975 | 8407 | 0.0 | 0.0 | 0.0 |
| 1976 | 7929 | 0.0 | 0.0 | 0.0 |
| 1977 | 8470 | 0.0 | 0.0 | 0.0 |
| 1978 | 8687 | 0.0 | 0.0 | 0.0 |
| 1979 | 8719 | 0.0 | 0.0 | 0.0 |
| 1980 | 8455 | 0.0 | 0.0 | 0.0 |
| 1981 | 3563 | 0.0 | 0.0 | 0.0 |
| 1982 | 1992 | 0.0 | 0.0 | 0.0 |
For data sources see[5]