X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354101213000

Well Details

Well ID: 0354101213000
Loading map...
Location: 00/13-12-035-10W4/0
Location Alias: 00/13-12-35-10 W4M
Location Alias 2: 00/13-12-035-10 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 10
Section: 12
County/Municipality: County of Paintearth No. 18
Well Name: KARVE PROVOST 13-12-35-10
Operator Name: Karve Energy Inc.
License Number: 0030961
License Date: 1966-09-12
License Status: Suspension
Spud Date: 1966-09-20
Final Drill Date: 1966-09-23
Well Total Depth: 908.30 m
Surface Hole Latitude: 51.995743
Surface Hole Longitude: -111.311211

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-09-12 Obtained License
1966-09-23 Finished Drilling
1966-09-23 Well Mode changed to Drilled and Cased
1966-09-24 Drill Stem Test Performed
1966-09-25 Production Casing Operation Performed
1966-10-13 Perforation Treatment Performed - Bullet Perforation
1966-10-15 Perforation Treatment Performed - Fractured
1966-12-19 Well Began Production
1966-12-19 Well Fluid changed to Crude Oil
1966-12-19 Well Mode changed to Pumping
1969-06-27 Well Began Injection
1969-06-27 Well Fluid changed to Water
1969-06-27 Well Type changed to Injection
1969-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-04-04 Perforation Treatment Performed - Fractured
1971-03-30 Perforation Treatment Performed - Condensate Squeeze
1972-10-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-01 Well Fluid changed to Water
1985-05-01 Well Mode changed to Suspended
1985-05-01 Well Type changed to Injection
2010-12-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-10-13 Bullet Perforation 890.30 891.50 13
1966-10-15 Fracture 890.03 891.50 0
1969-11-26 Acid Treatment 890.30 891.50 0
1970-04-04 Fracture 890.30 891.50 0
1971-03-30 Condensate Squeeze 890.30 891.50 0
1972-10-26 Acid Treatment 890.30 891.50 0
2010-12-16 Packing Device Capped w/Cement 872.00 880.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 3162 0.0 0.0 0.0
1968 1304 0.0 0.0 0.0
1969 2016 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0

For data sources see[5]

References