X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354102501000

Well Details

Well ID: 0354102501000
Loading map...
Location: 00/01-25-035-10W4/0
Location Alias: 00/01-25-35-10 W4M
Location Alias 2: 00/01-25-035-10 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 10
Section: 25
County/Municipality: County of Paintearth No. 18
Well Name: KARVE PROVOST 1-25-35-10
Operator Name: Karve Energy Inc.
License Number: 0026005
License Date: 1964-04-22
License Status: Suspension
Spud Date: 1964-05-28
Final Drill Date: 1964-05-31
Well Total Depth: 914.40 m
Surface Hole Latitude: 52.028651
Surface Hole Longitude: -111.293511

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-04-22 Obtained License
1964-05-31 Finished Drilling
1964-05-31 Well Mode changed to Drilled and Cased
1964-06-02 Drill Stem Test Performed
1964-06-02 Production Casing Operation Performed
1964-06-29 Perforation Treatment Performed - Jet Perforation
1964-08-09 Perforation Treatment Performed - Abrasa-Jet Perforation
1964-08-09 Perforation Treatment Performed - Fractured
1964-09-22 Well Began Production
1964-09-22 Well Fluid changed to Crude Oil
1964-09-22 Well Mode changed to Pumping
1969-09-10 Perforation Treatment Performed - Fractured
1995-10-01 Well Fluid changed to Crude Oil
1995-10-01 Well Mode changed to Suspended
1996-11-01 Well Fluid changed to Crude Oil
1996-11-01 Well Mode changed to Pumping
2009-06-23 Well Fluid changed to Crude Oil
2009-06-23 Well Mode changed to Suspended
2011-01-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-06-29 Perforation 898.20 899.50 13
1964-08-09 Hydra Jet Perforation 898.90 899.20 0
1964-08-09 Hydra Jet Perforation 899.80 899.80 0
1964-08-09 Fracture 898.90 899.80 0
1969-09-10 Fracture 898.20 899.50 0
2011-01-16 Packing Device Capped w/Cement 879.00 887.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 2712 0.0 0.0 0.0
1968 6026 0.0 0.0 0.0
1969 7512 0.0 0.0 0.0
1970 8729 0.0 0.0 0.0
1971 8699 0.0 0.0 0.0
1972 8693 0.0 0.0 0.0
1973 8619 0.0 0.0 0.0
1974 8739 0.0 0.0 0.0
1975 8743 0.0 0.0 0.0
1976 8775 0.0 0.0 0.0
1977 8673 0.0 0.0 0.0
1978 8750 0.0 0.0 0.0
1979 8359 0.0 0.0 0.0
1980 8705 0.0 0.0 0.0
1981 8711 0.0 0.0 0.0
1982 6767 0.0 0.0 0.0
1983 4676 0.0 0.0 0.0
1984 5136 0.0 0.0 0.0
1985 6223 0.0 0.0 0.0
1986 5684 0.0 0.0 0.0
1996 96 0.0 0.0 0.0
1997 2728 0.0 0.0 0.0
1998 8365 0.0 0.0 0.0
1999 8735 0.0 0.0 0.0
2000 1032 0.0 0.0 0.0

For data sources see[5]

References