X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354102601000

Well Details

Well ID: 0354102601000
Loading map...
Location: 00/01-26-035-10W4/0
Location Alias: 00/01-26-35-10 W4M
Location Alias 2: 00/01-26-035-10 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 10
Section: 26
County/Municipality: County of Paintearth No. 18
Well Name: CENERGY PROVOST 1-26-35-10
Operator Name: Cenergy Resources Limited
License Number: 0028545
License Date: 1965-07-09
License Status: RecCertified
Spud Date: 1965-07-11
Final Drill Date: 1965-07-16
Well Total Depth: 908.30 m
Surface Hole Latitude: 52.028652
Surface Hole Longitude: -111.317334

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-07-09 Obtained License
1965-07-16 Finished Drilling
1965-07-16 Well Mode changed to Drilled and Cased
1965-07-17 Production Casing Operation Performed
1965-07-22 Perforation Treatment Performed - Jet Perforation
1965-07-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-07-23 Perforation Treatment Performed - Fractured
1965-08-09 Well Began Production
1965-08-09 Well Fluid changed to Crude Oil
1965-08-09 Well Mode changed to Pumping
1990-10-01 Well Fluid changed to Crude Oil
1990-10-01 Well Mode changed to Suspended
1994-09-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-09-08 Perforation Treatment Performed - Jet Perforation
1994-09-08 Perforation Treatment Performed - Remedial Casing
1994-09-08 Plug Back Performed
1994-09-08 Well Fluid changed to Crude Oil
1994-09-08 Well Mode changed to Abandoned
1994-09-10 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-07-22 Perforation 887.60 888.50 13
1965-07-23 Acid Treatment 887.60 888.50 0
1965-07-23 Fracture 887.60 888.50 0
1994-09-08 Packing Device Capped w/Cement 872.00 880.00 0
1994-09-08 Perforation 249.00 250.00 7
1994-09-08 Remedial Casing Cementing 249.00 250.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1778 0.0 0.0 0.0
1968 6551 0.0 0.0 0.0
1969 6395 0.0 0.0 0.0
1970 7730 0.0 0.0 0.0
1971 8431 0.0 0.0 0.0
1972 8738 0.0 0.0 0.0
1973 8743 0.0 0.0 0.0
1974 8563 0.0 0.0 0.0
1975 8387 0.0 0.0 0.0
1976 8681 0.0 0.0 0.0
1977 8700 0.0 0.0 0.0
1978 8374 0.0 0.0 0.0
1979 7586 0.0 0.0 0.0
1980 8412 0.0 0.0 0.0
1981 8635 0.0 0.0 0.0
1982 8623 0.0 0.0 0.0
1983 8734 0.0 0.0 0.0
1984 8533 0.0 0.0 0.0
1985 8595 0.0 0.0 0.0
1986 1388 0.0 0.0 0.0
1987 1366 0.0 0.0 0.0
1988 8755 0.0 0.0 0.0
1989 1128 0.0 0.0 0.0

For data sources see[5]

References