X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354102604000

Well Details

Well ID: 0354102604000
Loading map...
Location: 00/04-26-035-10W4/0
Location Alias: 00/04-26-35-10 W4M
Location Alias 2: 00/04-26-035-10 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 10
Section: 26
County/Municipality: County of Paintearth No. 18
Well Name: CENERGY PROVOST 4-26-35-10
Operator Name: Cenergy Resources Limited
License Number: 0054909
License Date: 1975-09-12
License Status: RecCertified
Spud Date: 1975-09-23
Final Drill Date: 1975-09-26
Well Total Depth: 902.20 m
Surface Hole Latitude: 52.029346
Surface Hole Longitude: -111.333846

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-09-12 Obtained License
1975-09-26 Finished Drilling
1975-09-26 Production Casing Operation Performed
1975-09-26 Well Mode changed to Drilled and Cased
1975-10-08 Perforation Treatment Performed - Jet Perforation
1975-10-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-10-16 Perforation Treatment Performed - Fractured
1975-12-19 Well Began Production
1975-12-19 Well Fluid changed to Crude Oil
1975-12-19 Well Mode changed to Pumping
1990-10-01 Well Fluid changed to Crude Oil
1990-10-01 Well Mode changed to Suspended
1994-09-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-09-05 Plug Back Performed
1994-09-05 Well Fluid changed to Crude Oil
1994-09-05 Well Mode changed to Abandoned
1994-09-06 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-10-08 Perforation 888.20 889.40 7
1975-10-12 Acid Treatment 888.20 889.40 0
1975-10-16 Fracture 888.20 889.40 0
1994-09-05 Packing Device Capped w/Cement 872.00 880.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 152 0.0 0.0 0.0
1976 8432 0.0 0.0 0.0
1977 8715 0.0 0.0 0.0
1978 8538 0.0 0.0 0.0
1979 8733 0.0 0.0 0.0
1980 8675 0.0 0.0 0.0
1981 8691 0.0 0.0 0.0
1982 8653 0.0 0.0 0.0
1983 8707 0.0 0.0 0.0
1984 8757 0.0 0.0 0.0
1985 8685 0.0 0.0 0.0
1986 8722 0.0 0.0 0.0
1987 8371 0.0 0.0 0.0
1988 8683 0.0 0.0 0.0
1989 8675 0.0 0.0 0.0
1990 4185 0.0 0.0 0.0

For data sources see[5]

References