X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354103606000

Well Details

Well ID: 0354103606000
Loading map...
Location: 00/06-36-035-10W4/0
Location Alias: 00/06-36-35-10 W4M
Location Alias 2: 00/06-36-035-10 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 10
Section: 36
County/Municipality: County of Paintearth No. 18
Well Name: ACL PROVOST 6-36-35-10
Operator Name: Karve Energy Inc.
License Number: 0354069
License Date: 2006-03-14
License Status: Issued
Spud Date: 2006-09-30
Final Drill Date: 2006-10-02
Well Total Depth: 1065.00 m
Surface Hole Latitude: 52.047221
Surface Hole Longitude: -111.306789

For data sources see[1][2]

Well History

Date Event
2006-03-14 Obtained License
2006-10-01 Surface Casing Operation Performed
2006-10-02 Finished Drilling
2006-10-02 Well Log Performed
2006-10-02 Well Mode changed to Drilled and Cased
2006-10-03 Production Casing Operation Performed
2006-10-03 Rig Released
2006-10-03 Well Log Performed
2006-10-24 Perforation Treatment Performed - Jet Perforation
2006-10-24 Well Log Performed
2006-11-03 Perforation Treatment Performed - Fractured
2006-11-24 Perforation Treatment Performed - Jet Perforation
2006-11-24 Well Log Performed
2006-11-26 Perforation Treatment Performed - Fractured
2006-12-06 Perforation Treatment Performed - Fractured
2008-07-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-07-28 Perforation Treatment Performed - Jet Perforation
2008-07-28 Plug Back Performed
2008-07-28 Well Log Performed
2008-07-28 Well Mode changed to Abandoned Zone
2008-08-02 Perforation Treatment Performed - Fractured
2011-10-17 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-10-24 Perforation 995.00 997.00 17
2008-08-02 Fracture 883.00 885.00 0
2011-10-17 Fracture 889.00 891.50 0
2011-10-17 Fracture 883.00 885.00 0
2006-11-03 Fracture 995.00 997.00 0
2006-11-24 Perforation 995.00 997.00 17
2006-11-26 Fracture 995.00 997.00 0
2006-12-06 Fracture 995.00 997.00 0
2008-07-28 Packing Device Capped w/Cement 982.00 990.00 0
2008-07-28 Perforation 889.00 891.50 17
2008-07-28 Perforation 883.00 885.00 17
2008-08-02 Fracture 889.00 891.50 0

For data sources see[4]



References