If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0354111310F10 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.00633,"lon":-111.442092,"icon":""}]} |
| Location: F1/10-13-035-11W4/0 | |
| Location Alias: F1/10-13-35-11 W4M | |
| Location Alias 2: F1/10-13-035-11 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 035 | |
| Meridian: 4 | |
| Range: 11 | |
| Section: 13 | |
| County/Municipality: County of Paintearth No. 18 | |
| Well Name: APACHE HAMIL WW 10-13-35-11 | |
| Operator Name: Apache Oil Corporation | |
| License Number: 0035006 | |
| License Date: 1968-10-17 | |
| License Status: RecExempt | |
| Spud Date: 1968-10-23 | |
| Final Drill Date: 1968-10-23 | |
| Well Total Depth: 262.10 m | |
| Surface Hole Latitude: 52.006330 | |
| Surface Hole Longitude: -111.442092 |
| Date | Event |
|---|---|
| 1968-10-17 | Obtained License |
| 1968-10-22 | Well Log Performed |
| 1968-10-23 | Finished Drilling |
| 1968-10-23 | Perforation Treatment Performed - Jet Perforation |
| 1968-10-23 | Production Casing Operation Performed |
| 1968-10-23 | Rig Released |
| 1968-10-23 | Well Mode changed to Drilled and Cased |
| 1969-01-11 | Well Began Production |
| 1969-01-11 | Well Fluid changed to Water |
| 1969-01-11 | Well Type changed to Source |
| 1969-07-16 | Well Log Performed |
| 1970-10-01 | Well Fluid changed to Water |
| 1970-10-01 | Well Mode changed to Suspended |
| 1970-10-01 | Well Type changed to Source |
| 1978-09-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1978-09-30 | Plug Back Performed |
| 1978-09-30 | Well Abandoned |
| 1978-09-30 | Well Fluid changed to Water |
| 1978-09-30 | Well Mode changed to Abandoned |
| 1978-09-30 | Well Type changed to Source |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1968-10-23 | Perforation | 98.10 | 101.50 | 7 |
| 1968-10-23 | Perforation | 246.90 | 253.00 | 7 |
| 1978-09-30 | Packing Device Capped w/Cement | 70.00 | 95.00 | 0 |
| 1968-10-23 | Perforation | 105.80 | 108.80 | 7 |
| 1968-10-23 | Perforation | 125.00 | 127.40 | 7 |
| 1968-10-23 | Perforation | 195.10 | 198.10 | 7 |
| 1968-10-23 | Perforation | 202.70 | 204.80 | 7 |
| 1968-10-23 | Perforation | 207.30 | 211.80 | 7 |
| 1968-10-23 | Perforation | 222.50 | 227.10 | 7 |
| 1968-10-23 | Perforation | 233.20 | 237.70 | 7 |
| 1968-10-23 | Perforation | 240.80 | 243.80 | 7 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1969 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]