X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354111402020

Well Details

Well ID: 0354111402020
Loading map...
Location: 02/02-14-035-11W4/0
Location Alias: 02/02-14-35-11 W4M
Location Alias 2: 02/02-14-035-11 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 11
Section: 14
County/Municipality: County of Paintearth No. 18
Well Name: ANDEX ET AL PROVO 2-14-35-11
Operator Name: Canadian Natural Resources Limited
License Number: 0047369
License Date: 1973-09-24
License Status: Re-Entered
Spud Date: 1973-09-24
Final Drill Date: 1973-09-27
Well Total Depth: 938.80 m
Surface Hole Latitude: 52.000409
Surface Hole Longitude: -111.463692

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-09-24 Obtained License
1973-09-27 Finished Drilling
1973-09-27 Production Casing Operation Performed
1973-09-27 Well Mode changed to Drilled and Cased
1973-10-08 Perforation Treatment Performed - Jet Perforation
1973-11-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-12-04 Well Began Injection
1973-12-04 Well Fluid changed to Water
1973-12-04 Well Type changed to Injection
1977-01-06 Perforation Treatment Performed - Jet Perforation
1977-10-04 Well Fluid changed to Water
1977-10-04 Well Type changed to Injection
1985-02-14 Well Fluid changed to Water
1985-02-14 Well Mode changed to Suspended
1985-02-14 Well Type changed to Injection
1990-03-29 Plug Back Performed
1990-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-09-29 Well Fluid changed to Water
1990-09-29 Well Mode changed to Abandoned Zone
1990-09-29 Well Type changed to Injection
1990-10-04 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-10-08 Perforation 906.50 908.00 7
1973-11-29 Acid Treatment 906.50 908.00 0
1977-01-06 Perforation 156.10 161.50 7
1990-09-29 Packing Device Capped w/Cement 138.00 146.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0

For data sources see[5]

References