If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354112214000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.018388,"lon":-111.493359,"icon":""}]} |
Location: 00/14-22-035-11W4/0 | |
Location Alias: 00/14-22-35-11 W4M | |
Location Alias 2: 00/14-22-035-11 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 11 | |
Section: 22 | |
County/Municipality: County of Paintearth No. 18 | |
Well Name: GRL HZ 6-22 PROVOST 14-22-35-11 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0438440 | |
License Date: 2011-11-03 | |
License Status: Issued | |
Spud Date: 2011-11-28 | |
Final Drill Date: 2011-12-04 | |
Well Total Depth: 1677.00 m | |
Surface Hole Latitude: 52.018388 | |
Surface Hole Longitude: -111.493359 |
Date | Event |
---|---|
2011-11-03 | Obtained License |
2011-11-28 | Surface Casing Operation Performed |
2011-11-28 | Well Log Performed |
2011-11-30 | Direction Drilling Operation Performed - Horizontal |
2011-12-02 | Intermediate Casing Operation Performed |
2011-12-04 | Finished Drilling |
2011-12-04 | Liner Casing Operation Performed |
2011-12-04 | Perforation Treatment Performed - Slotted Liner or Casing |
2011-12-04 | Well Mode changed to Drilled and Cased |
2011-12-05 | Rig Released |
2011-12-05 | Well Began Production |
2011-12-05 | Well Fluid changed to Crude Oil |
2011-12-05 | Well Mode changed to Pumping |
2011-12-12 | Perforation Treatment Performed - Open-Hole Completion |
2011-12-12 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-11-30 | 640.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-12-04 | Slotted Liner | 1085.00 | 1605.80 | 0 |
2011-12-12 | Open Hole/Barefoot Completion | 1605.80 | 1677.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 194 | 0.0 | 0.0 | 0.0 |
2012 | 8181 | 0.0 | 0.0 | 0.0 |
2013 | 7811 | 0.0 | 0.0 | 0.0 |
2014 | 5114 | 0.0 | 0.0 | 0.0 |
2015 | 8337 | 0.0 | 0.0 | 0.0 |
2016 | 8224 | 0.0 | 0.0 | 0.0 |
2017 | 4807 | 0.0 | 0.0 | 0.0 |
2018 | 8349 | 0.0 | 0.0 | 0.0 |
2019 | 8314 | 0.0 | 0.0 | 0.0 |
2020 | 2123 | 0.0 | 0.0 | 0.0 |
For data sources see[6]