X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354112410F10

Well Details

Well ID: 0354112410F10
Loading map...
Location: F1/10-24-035-11W4/0
Location Alias: F1/10-24-35-11 W4M
Location Alias 2: F1/10-24-035-11 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 11
Section: 24
County/Municipality: County of Paintearth No. 18
Well Name: APACHE BAYSEL HAMIL WW 10-24-35-11
Operator Name: Apache Oil Corporation
License Number: 0035007
License Date: 1968-10-17
License Status: RecExempt
Spud Date: 1968-10-29
Final Drill Date: 1968-10-29
Well Total Depth: 263.30 m
Surface Hole Latitude: 52.020747
Surface Hole Longitude: -111.442765

For data sources see[1][2]

Well History

Date Event
1968-10-17 Obtained License
1968-10-29 Finished Drilling
1968-10-29 Perforation Treatment Performed - Jet Perforation
1968-10-29 Production Casing Operation Performed
1968-10-29 Rig Released
1968-10-29 Well Mode changed to Drilled and Cased
1968-11-02 Well Log Performed
1969-02-14 Well Began Production
1969-02-14 Well Fluid changed to Water
1969-02-14 Well Type changed to Source
1973-05-08 Well Log Performed
1974-10-01 Well Fluid changed to Water
1974-10-01 Well Mode changed to Suspended
1974-10-01 Well Type changed to Source
1978-10-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-10-13 Plug Back Performed
1978-10-13 Well Abandoned
1978-10-13 Well Fluid changed to Water
1978-10-13 Well Mode changed to Abandoned
1978-10-13 Well Type changed to Source

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-10-29 Perforation 71.60 75.30 7
1968-10-29 Perforation 90.80 93.90 7
1968-10-29 Perforation 103.60 106.70 7
1968-10-29 Perforation 136.60 140.80 7
1968-10-29 Perforation 203.60 207.30 7
1968-10-29 Perforation 216.40 221.00 7
1968-10-29 Perforation 228.00 231.00 7
1978-10-13 Packing Device Capped w/Cement 23.10 59.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0

For data sources see[5]

References